Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02CM05794
Parcel: 11501155D

Address:
2160 N 6TH AV

Review Status: Completed

Review Details: RESUBMITTAL - SITE

Permit Number - T02CM05794
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/15/2003 JIM TATE ENGINEERING REVIEW Denied DATE: April 15, 2003
ACTIVITY NUMBER: T02CM05794
PROJECT NAME: Northwest Center and Mansfield Park
PROJECT ADDRESS: 2160 N. 6th
PROJECT REVIEWER: James C. Tate, P.E.

The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed.

Resubmittal Required: Site Plan, Drainage Report

The Drainage report was reviewed for Site Plan purposes only

1. Sidewalks are required along the entire street frontage. Provide a sidewalk along 4th. Provide a sidewalk from the new parking places on Sahuaro to 4th. DS 3-01.3.3.A

2. Show the MS&R future right-of-way (6th Ave. future right-of-way width of 64 ft.). Show the future sight-visibility-triangles. The face of future curb is located 10 ft. from the future right-of-way. DS 2-02.2.1.A19

3. Finished floor elevations of structures must be a minimum of one foot above the 100-yr. water surface elevation of any adjacent detention/retention basin. The finished floor elevation of the new building is not 1 foot above the maximum WSEL of the basin (based on the weir invert elevation). See Drainage Report Comment Number 1 below. Stormwater Detention/Retention Manual, SDRM, 3.5.1.10


Drainage Report

1. The Report states that the top elevation of the basin is 2395.2. The scupper (outlet weir) invert elevation is 2395.2. The basin will overflow its banks as the weir WSEL rises. This is not an acceptable drainage solution. Size the scupper and correct the elevations such that the drainage is controlled completely through the outlet structure. Correctly determine the maximum WSEL and ponding limits. Determine the correct minimum FFE of the building.
Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 2.3.1.6.A.e

2. Page A-7 (worksheet 4" pipe) is incorrect. The correct slope for the worksheet is .007 ft/ft. The worksheet provided incorrectly used a slope of .7 ft/ft. This resulted in an artificially high flow rate. Correct the worksheet and resize the drainage structure as necessary. SMDDFM, 2.3.1.5.C

3. Page A-8 (worksheet north side valley gutter) indicates a flow depth of .4283 ft. with a top width of 6.47 ft. Section A Sheet C6 of the Site Plan shows this drainage structure to have a maximum depth of .2 ft. and a maximum top width of 4 ft. Section A also shows the gutter side slope as 10:1 (.1 ft/ft). The worksheet shows the side slope as .133. Correct the worksheet Correctly size this drainage structure. SMDDFM, 2.3.1.5.C

4. Page A-9 (worksheet east side valley gutter) indicates a flow depth of .3384 ft. with a top width of 5.1191 ft. Section B Sheet C6 of the Site Plan shows this drainage structure to have a maximum depth of .2 ft. and a maximum top width of 4 ft. Section B also shows the gutter side slope as 10:1 (.1 ft/ft). The worksheet shows the side slope as .133. Correct the worksheet Correctly size this drainage structure. SMDDFM, 2.3.1.5.C

5. Scupper capacity Page A-10 is incorrect. At a flow depth of .37 ft. (worksheet flow depth) and a headwater depth the same the maximum flow rate is .95 cfs (as determined using FlowMaster). The worksheet shows 5.1 cfs. Correct the worksheet. Absolute elevations should be used on the worksheets. With a weir invert elevation of 2395.2 the WSEL for the 10-yr event would be 2395.2 plus .37 or 2395.57. This would be the 10-yr peak WSEL and would overflow the banks of the basin. However, because the worksheet is incorrect the scupper is undersized and the maximum WSEL is much higher than that indicated. Also, the scupper must be sized for the 100-yr. event. The basin must not be allowed to overflow its banks up to the peak 100-yr. event. Correctly size the scupper. Correctly determine the peak 100-yr. WSEL and ponding limits. SMDDFM, 2.3.1.5.C

6. Pages A-11 and A-12 (scupper worksheets) are incorrect. The maximum flow rate for a Type 2 scupper is approximately 1 cfs per foot of width. The worksheet shows 5.1 cfs for a scupper width of 1.67 ft. Correct the worksheet and properly size the scupper. . SMDDFM, 2.3.1.5.C

James C. Tate, P.E.
Civil Engineer
04/17/2003 PETER MCLAUGHLIN HANDICAP-SITE REVIEW Approved
04/17/2003 PETER MCLAUGHLIN ZONING REVIEW Approved
05/02/2003 JOE LINVILLE NPPO REVIEW Approved Exception
05/02/2003 JOE LINVILLE LANDSCAPE REVIEW Approved