Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM05794
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/09/2003 | JIM EGAN | FIRE | REVIEW | Denied | Show location of existing fire sprinkler riser and fire sprinkler underground piping on plan.( It appears that the new construction may be over the existing underground piping which is not permitted. The existing riser and underground piping may have to be relocated.) |
| 01/14/2003 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site plan approval required. See zoning review comments dated 1/14/03 |
| 02/07/2003 | JAMES TATE | FLOODPLAIN | REVIEW | Denied | A copy of the stamped approved Site Plan must be included with the submittal. |
| 02/12/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/19/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Recalculate plumbing schedule using the values shown on Tables 7-3 and A-2, UPC. Include 2. Coordinate plumbing schedule with plans and riser diagrams. 3. Confirm total natural gas load shown at meter corresponds to individual loads shown on plans and schedules. 4. Size all sections of natural gas pipe using Table 12-3, UPC or provide calculations demonstrating conformance to Section 1217.3, UPC. 5. Confirm that condensate drains terminate in an area that is capable of absorbing the condensate flow without surface drainage in accordance with Section 307.2.1, IMC as amended by the City of Tucson. 6. Provide slope of horizontal rainwater piping. 7. Coordinate sizing of RWL under building with Civil. Provide calculations to confirm that the slope and size of the pipe meets the requirements of Section D3.3, UPC. 8. Coordinate location of SP-1 with Architectural. |
| 02/19/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Room 114 requires natural ventilation or mechanical ventilation. Reference Section 401.2. IMC. 2. Provide ventilation calculations broken down by air handling system to demonstrate conformance with Section 403.3.2, IMC. 3. Provide principal's signature on compliance statement of Energy Code Compliance Calculations (two places). Complete the Requirements Checklist. |
| 02/19/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/27/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 03/06/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Storage areas over 100 square feet are incidental uses to the major occupancy thereby requiring a one-hour fire separation. Revise plans and details to reflect one-hour separation. Reference section 302.1.1 IBC 2. Accessible drinking fountain is required to have a minimum of 30" on center for toe and knee clearance. Section 602.2 ANSI 117.1. Please clarify 3. In order to determine the minimum number of plumbing fixtures required Chapter 29 of the IBC should be used. Revise plans 4. Provide structural analysis for sloped glazing as per section 2404.2 IBC |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/07/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |