Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02CM05789
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/10/2003 | JIM EGAN | FIRE | REVIEW | Denied | 1. Fire sprinklers required per 2000 IBC Sec. 903.2.2 (Tucson Amendments). 2. Show location of required panic hardware on plan. |
06/11/2003 | GERRY KOZIOL | WWM | REVIEW | Denied | Site plumbing does not match building plumbing drawings |
06/17/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
06/17/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Resolve the difference between drawings C-3 and P-1.2 with regard to the location and size of the building water supply line. Second Request. 2. Resolve the difference between drawings C-3 and P-1.1 with regard to the location of the building sewer. Second Request. 3. Provide location, size, and equipment data for the site backflow preventer. Note: the size of the backflow preventer shall comply to the requirements of Section 610.2, UPC 1994. 4. Provide up and downstream manhole rim elevations, and sewer inverts. 5. Provide roof drain calculations. Reference Appendix D, UPC. 6. Revise roof drain detail shown on sheet A-22 to comply with D1.1 (d), UPC. 7. Provide calculations to show the scuppers shown on sheet A-4 are adequately sized and properly located. Second Request. 8. Termination of the excess pressure relief from the water heater over a service sink (Room 125) is not approved location. Reference Section 608.5, UPC 1994. 9. Show size, route, and termination of excess pressure relief from water heater WH-2. Reference Section 608.5, UPC 1994. |
06/26/2003 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | Building Plans may not be approved prior to Drainage Report/Site Plan approval. |
07/07/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/07/2003 | DAN CASTRO | ZONING | REVIEW | Denied | Structural plans may not be approved until the site plan is approved and the structural plans are approved by the Commercial reviewers. |
07/10/2003 | Martin Haeberle | BUILDING-COMMERCIAL | REVIEW | Denied | Response letter has addressed only eleven of the fifty correction items. Of the items that were addressed in the response letter, numbers 1,5,7,8,& 9 are still not adequately addressed. Please submit a complete response letter and address each corrective action. Respectfully request that an appointment be made with myself or Mr Laakso prior to resubmittal to help expedite the plan review process. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/18/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |
07/17/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |