Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T02CM05764
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide a 1-hr wall separation between the gas storage room and the office space. Provide a detail of the 1-hr wall. Also, provide a 1-hr door. Sec. 414.2 & 414.2.1 |
| 01/23/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 1/23/2003 Zoning comments on the white card have not been addressed. Prior to approval, sufficient on-site parking for this and all tenants must be documented. |
| 01/30/2003 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.M-15 load is not accurate s/b 1620 watts. 2.Is M-17 load 10 amps?(E-1),Panel schedule (E-3) indicates load as 6.6 amps? please clarify.3.M-29 load is missing from panel schedule. 4.Describe cir. M-41.(E-1),load ? 5.Indicate M-24 load at panel schedule(e-3).6.M2-2 breaker s/b a 2pole breaker not a single pole.(E-3). 7. M-29 load is missing at panel schedule (E-3). 8.Indicate exit lighting wattages and exh. fan loads. 9.Properly calc. load on cir.M-10.(E-3,E-2). 10. Recalculate load on panels M,M2 after all corrections made. 11. Update service loads(E-3). 12.Revise M.E.C. calcs. after all corrections made to loads(E-2,E-3). |
| 02/03/2003 | MARTIN HAEBERLE | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water pressure and water pipe sizing calculations. Reference Appendix A, UPC. 2. Coordinate plumbing schedule, plans, and riser diagrams. 3. Coordinate water heater detail with plans and riser diagrams. Indicate height of water heater platform. 4. Verify that the effluent of the equipment drains (air compressor and vacuum pump) complies with Section 307.0, UPC. |
| 02/03/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/03/2003 | MARTIN HAEBERLE | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide approved combination fire/smoke dampers for protection of ducts and penetrations of fire resistive walls at gas storage room. Reference Section 715, IBC. 2. Provide calculations verifying compliance with requirements for medical gas storage rooms. Reference Sections 501, 502.7, and 502.8, IMC and, Section 3006, IFC 3. Coordinate design of gas storage room with architectural design, sheet A1. 4. Provide energy code compliance calculations. 5. Provide duct smoke detector for HP-1. Reference Section 606.2.1 6. Provide calculations demonstrating adequate ventilation. Reference Section 401, IMC. 7. Provide heating capacities for rooftop units. 8. Revise plans as required to provide a separation of at least ten feet between air intake openings and exhaust openings. Reference 401.5, IMC. |
| 12/16/2002 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 12/18/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 12/18/2002 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/05/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |