Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T02CM05552
Parcel: 13201001B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T02CM05552
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2003 JIM EGAN FIRE REVIEW Approved
03/11/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Confirm that the section of existing sewer running under the northwest corner of the multipurpose building complies with Section 313.4, UPC.
2. Indicate the slope of the new building sewer. Reference Section 718.1, UPC.
3. Provide the total number of fixture units to be handled by the 6" building sewer. Reference 703.1, UPC 1994.
4. Indicate disposition of bypassed natural gas pipe (keynote 16): abandon in place or remove? Reference Section 1211.3, UPC.
5. Correct size of fire department connection. Reference Section 4-15.2.2, NFPA 13.
6. Indicate the inverts of the new building sewer at its points of connection to the existing building sewer as well as its minimum slope. Reference Sections 718.1 and 718.3, UPC 1994.
7. Provide detail of water heater installation, including excess pressure relief, expansion tank, and valves. Reference Section 302.3, Uniform Administrative Code 1994.
8. Confirm that suspended water heater complies with access requirements of Section 511.0, UPC 1994.
9. Coordinate stack and riser diagram with floor plan.
10. Provide cleanouts at P-1, P-2, P-3, and S-1 fixtures. Reference Section 707.4, UPC 1994.
11. Coordinate natural gas calculations with heating capacity of rooftop units on mechanical plans.
12. Provide water shut off valves as required in Section 605.1, UPC 1994.
03/11/2003 ROBERT SHERRY WATER REVIEW Approved
03/11/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide minimum outside air quantity to multipurpose room per Table 403.3, IMC 2000 whenever the area is occupied. Additional outside air may be supplied as required to maintain the CO2 concentration as noted in the Sequence of Operation.
2. Coordinate mechanical components listed in Summary Compliance Report with equipment specified on drawings.
03/18/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied 1.A deferred submittal requires approval of the Building Official. Submit in writing a request for deferral of the metal building plans to the Building Official.
2. Complete the assumed property line between buildings or include allowable area calculations for adjacent structures. References section 704.3 IBC.
3. Provide existing and new buildings plumbing fixture count showing compliance with the total fixtures required per Table 2902.1 IBC.
4. Clarify location and size of grease interceptor in relation to the proposed building. Foundation design to address loads imposed on interceptor. Note: Grease interceptors are not typically 2 feet by 4 feet.
03/20/2003 GERRY KOZIOL WWM REVIEW Approved
03/26/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

1. Provide rooftop receptacles for AC-1 through AC-3. On Sheet 4M1 these units appear to have convenience outlets, but per NEC 210-63 these outlets shall not be connected to the load side of the equipment disconnecting means.
2. Provide 45A CB on branch circuits to AC units, per manufacturer recommendations. From a telephone conversation with John Jolly, 3/26/03.
12/03/2002 JAMES TATE FLOODPLAIN REVIEW Approved
12/03/2002 DAVID RIVERA ZONING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/10/2003 TAMI ACHONG OUT TO CUSTOMER Completed