Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02CM05551
Parcel: 12702363A

Address:
5145 E 5TH ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T02CM05551
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/11/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Note 9 and the revised note 14 on sheet 3M1 are contradictory; please revise.
2. Coordinate mechanical components listed in Summary Compliance Report with equipment specified on drawings. Second request.
04/11/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Indicate the inverts of the new building sewer at its points of connection to the existing building sewer and to the HCS as well as its minimum slope. Reference Sections 718.1 and 718.3, UPC 1994. Second request.
2. Coordinate stack and riser diagram with floor plan. Second request.
3. Coordinate natural gas calculations with heating capacity of rooftop units on mechanical plans. Second request.
4. Termination of the excess pressure relief from the water heater over service sink S-1 is not approved location. Reference Section 608.5, UPC 1994.
5. Provide design of mounting method for suspended water heater. Indicate height of water heater platform. Reference Section 302.3, Uniform Administrative Code 1994.
6. No shut off valve may be located between the water heater and the thermal expansion tank. Reference Section 608.3, UPC 1994.
7. New section of waste line revised from 6" to 4" on sheet 1MP1 but not revised on sheet 1P1; please coordinate drawings.
04/21/2003 GERRY KOZIOL WWM REVIEW Denied New 4" private sewer needs to connect to a manhole either new or existing (fronts 15" is public sewer)
05/05/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
05/06/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied 1.A deferred submittal requires approval of the Building Official. Submit in writing a request for deferral of the metal building plans to the Building Official.
A letter is needed seperate from the response letter. You may put all 4 projects on one letter. Please include permit numbers and approximate date of the deferred submittal.

2. Complete the assumed property line between buildings or include allowable area calculations for adjacent structures. References section 704.3 IBC.
Area calculations provided do not include existing structures.
reference section 503.1.3 IBC. Clarify location of assumed property line and rating of exterior walls if calculations are not to be revised

3. Provide existing and new buildings plumbing fixture count showing compliance with the total fixtures required per Table 2902.1 IBC
As per agreement with TUSD and Dave Mann, Building Official. If calculations are not provided as requested the new building must include required plumbing fixtures as per Table 2902.1 IBC
Revise Plan

Final Status

Task End Date Reviewer's Name Type of Review Description
05/07/2003 TAMI ACHONG OUT TO CUSTOMER Completed