Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T02CM05551
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/11/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Verify size of RPBP after meter (detail 6/m2) complies to Section 610.2, UPC 1994. 2. Confirm values used for domestic water service calculation (Sheet 1MP1). The pressure drop for a typical RPBP is approximately 12 PSI and most low-consumption water closets require 20-25 PSI minimum pressure. 3. Provide cleanouts in the building sewer at intervals not exceeding 100 feet. Reference Section 719.1, UPC 1994. 4. Correct size of fire department connection. Reference Section 4-15.2.2, NFPA 13. 5. Provide the total number of fixture units to be handled by the new 6" building sewer. Reference 703.1, UPC 1994. 6. Provide rim elevation of the next upstream manhole and the floor elevation of the building to confirm compliance with Section 710.1, UPC 1994. 7. Indicate the inverts of the new building sewer at its points of connection to the existing building sewer and to the HCS as well as its minimum slope. Reference Sections 718.1 and 718.3, UPC 1994. 8. Provide detail of water heater installation, including excess pressure relief, expansion tank, and valves. Reference Section 302.3, Uniform Administrative Code 1994. 9. Confirm that suspended water heaters comply with access requirements of Section 511.0, UPC 1994. 10. Coordinate stack and riser diagram with floor plan. 11. Provide cleanouts at P-2 fixtures. Reference Section 707.4 (1), UPC 1994. 12. Provide upper terminal cleanouts at S-1, P-3, and P-1 (Female Toilet). Reference Section 707.4, UPC 1994. 13. Provide shut off valves as required in Section 605.1, UPC 1994. 14. Coordinate natural gas calculations with heating capacity of rooftop units on mechanical plans. |
| 03/11/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/11/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide minimum outside air quantity to multipurpose room per Table 403.3, IMC 2000 whenever the area is occupied. Additional outside air may be supplied as required to maintain the CO2 concentration as noted in the Sequence of Operation. 2. Coordinate mechanical components listed in Summary Compliance Report with equipment specified on drawings. |
| 03/18/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1.A deferred submittal requires approval of the Building Official. Submit in writing a request for deferral of the metal building plans to the Building Official. 2. Provide location of the assumed property line between buildings or include allowable area calculations for adjacent structures. Note include the existing canopy. References section 704.3 IBC. 3. If assumed property line is to be used provide details for required fire protection. Reference Table 602 IBC 4. Provide existing and new buildings plumbing fixture count showing compliance with the total fixtures required per Table 2902.1 IBC. |
| 03/20/2003 | GERRY KOZIOL | WWM | REVIEW | Denied | New 6" private sewer needs to connect to a manhole either new or existing. |
| 03/26/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Provide rooftop receptacles for AC-1 through AC-3. On Sheet 1M1 these units appear to have convenience outlets, but per NEC 210-63 these outlets shall not be connected to the load side of the equipment disconnecting means. 2. Provide 45A CB on branch circuits to AC units, per manufacturer recommendations. From a telephone conversation with John Jolly, 3/26/03. |
| 12/03/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 12/03/2002 | DAVID RIVERA | ZONING | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/10/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |