Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T02CM05480
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/03/2003 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | To: E.A. Fagin & Associates Architects 10 S. Church Ave. SUBJECT: 60 N. Harrison Road Site plan T02CM05480 (Second Review) T15S, R15E, Section 11 RESUBMITTAL REQUIRED: Site Plan and Drainage Statement. The Site Plan (SP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Site Plan: 1. The Site plan and Grading plan are separate entities. All the site plan comments are required to be shown or addressed on the site plans. 2. Please provide Drainage patterns per D.S. 2-02.2.1.16. 3. Please list estimated cut & fill quantities per D.S. 2-02.2.1.17. 4. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23. 5. Show and label existing and future sight visibility triangles per D.S. 2-02.2.1.10. 6. Please show a typical cross section of the P.A.A.L. or call out the percentage of slopes. Call out the GB at the D/W, if applicable. 7. Please show the proposed roof drainage patterns. If the location(s) of the roof scuppers have not yet been decided, a general note indicating sidewalk scuppers will be used when the roof scuppers locations have been designed will suffice. The civil engineer must calculate the size of the scupper (shown in drainage statement) and the location(s) must be shown on the site plan. 8. Add basin maintenance responsibility note to plans and also refer to previous drainage report and date in the note. Drainage Statement: 1. Provide a new cross-section of the basin in the DS showing new elevations and bleeder pipe. If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate, |
02/03/2003 | ASHOFFS1 | SANITATION | REVIEW | Approved | |
02/03/2003 | ASHOFFS1 | FLOODPLAIN | REVIEW | Approved | To: E.A. Fagin & Associates Architects 110 S. Church Ave. SUBJECT: 60 N. Harrison Road Site plan T02CM05480 (Second Review) T15S, R15E, Section 11 RESUBMITTAL REQUIRED: Drainage Statement. The Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Drainage Statement: 1. Provide a new cross-section of the basin in the DS showing new elevation and bleeder pipe. If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate, |
02/12/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
02/12/2003 | JOE LINVILLE | NPPO | REVIEW | Approved | |
02/14/2003 | JIM TUCKER | FIRE | REVIEW | Denied | SUBMIT APPROVED COT WATER PLAN FOR UNDERGROUND WATER MAIN EXTENSION. |
02/21/2003 | DAN CASTRO | HANDICAP-SITE | REVIEW | Approved | |
02/21/2003 | LOREN MAKUS | NPDES | REVIEW | Passed | |
02/27/2003 | DAN CASTRO | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/04/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |