Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T02CM05432
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/22/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 11/22/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 11/22/2002 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 12/03/2002 | MARTIN HAEBERLE | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 12/03/2002 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. The proposed occupant load does not reflect the minimum number of plumbing fixtures as required by Table 2902.1 of the IBC. Revise plans to meet the minimum plumbing fixtures per Table 2902.1 of the IBC. 2. Proposed storage room is required to have a 1-hour separation as per Table 302.1.1 of the IBC. Revise plans to reflect the required separation. 3. Storage room is to have minimum protection of openings for a 1-hour fire barrier. Revise plans to indicate required protection of the door assembly and duct penetration. Reference Table 714.2 IBC 4. Provide bracing for interior partition walls. Reference section 1604.3.1 IBC 5. Provide hardware schedule for exit doors and fire door. 6. Exit door requires 12" side approach clearance if door and closer used. Please clarify. Reference figure 404.2.4.1 ANSI A117.1 7. Illuminated signage is not provided at all required exits. Reference section 1003.2.10 IBC. Revise plans. |
| 12/03/2002 | MSTPAUL1 | WWM | REVIEW | Passed | |
| 12/03/2002 | MHAEBER1 | WATER | REVIEW | Approved | |
| 12/03/2002 | MARTIN HAEBERLE | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 12/06/2002 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.Font size is too small at panel schedules. 2.Indicate panel designation oncircuiting. 3.Add exit lights per structural reviewers comments and revise calculations to reflect added load. 4.Correct panel schedules (cir. 13 is not described @ panel "AB", and@ panel "A" it's described as evap. cooler? 5.Indicate the allowed wirig method (conduit/MC cable etc.). |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/06/2002 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |