Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02CM05370
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/30/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 11/03/2003 | Blanca Espino | ENGINEERING | REVIEW | Denied | APPROVED SITE PLAN REQUIRED. |
| 11/18/2003 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide cleanouts for the building sewer in accordance with the requirements of Section 719, UPC 1994. 2. Comment not addressed. Coordinate Unit #3 Stack Diagram with 1st floor plumbing plan; clean out for P-3 not shown on riser diagram. Show how clean out will be handled on Units 2 and 5. Reference Section 302.3, Uniform Administrative Code, 1997. 3. Comment not addressed. Show how the clean outs for P-3 and P-3A (Units 4 and 6) are readily accessible. Reference Section 707.9, UPC. 4. Comment not properly addressed. Coordinate 1st Floor Riser Diagram with Detail A/P3. Diagram shows expansion tank connected to hot water; the equipment listing requires connection to cold water. Labeling the section of pipe leading to the expansion tank as "CW" is insufficient. Reference Section 301.2, UPC 1994. 5. Comment not addressed. Revise the pipe sizes shown on 1st Floor Riser Diagram using the methods described in Section 610, UPC 1994. The sizes should reflect the results of the water calculations shown on sheet P1 and should restrict the water velocities as noted in Section A 6.1,UPC 1994 and Section 610.0, IAPMO Installation Standard 3-93. 6. Coordinate floor and manhole rim elevations as shown on sheet A2 with the elevations shown in Note 11 on sheet P1. Edit Note 11 as required and modify the drawings (including the stack diagrams) to consistently show either the presence or absence of backwater valves. Reference Section 710.1, UPC 1994. 7. Comment not addressed. Second floor building drain clean out is required per Sections 707.4 and 707.5, UPC 1994, as amended by the State of Arizona. Revise drawing as required. 8. Comment not addressed. Show routing of P/T relief pipes from water heaters. Reference Section 302.3, Uniform Administrative Code, 1997. Second request. 9. Comment not addressed. If the water heater (WH-1) is not supplied with integral heat traps, provide heat traps as required by Section 504.9, IECC 1998. |
| 11/18/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Show sizes and routes of condensate drains on plans. 2. Comment not addressed. The Model Energy Code analysis supplied does not provide enough information to demonstrate compliance to Section 502.2.2 or Section 502.2.3, IECC 1998. |
| 11/24/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 11/24/2003 Building plans may not be reviewed and approved until the site plan has been approved. |
| 11/26/2003 | Martin Haeberle | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | Truss calcs need layout in order to complete shop drawing review |
| 11/28/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/28/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 11/28/2003 | TAMI ACHONG | REJECT SHELF | Completed |