Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02CM05355
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/17/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise size of grease trap to conform to Table 10-2, UPC: two fixtures (not fixture units) connected to the grease trap results in a flow rate of 25 GPM and a grease retention capacity of 50 pounds. 2. Relocate the flow control device for the grease trap to conform to the requirements of Section 1011.3, UPC. 3. Provide a vent for the grease interceptor. Reference Section 901.0, UPC. 4. Vents on indirect waste piping shall not be connected to any sewer-connected vent. Reference Section 803.0, UPC. Note: indirect waste piping less than 15 feet in length does not require a vent. 5. Provide vents for floor sinks and mop sink. Reference section 901.0, UPC. 6. What type of fuel is being used, natural gas or propane? Mechanical Note 6, Sheet 9 calls for propane; calculations on Sheet 9 are for natural gas. 7. Show locations and sizes of water meter, reduced pressure backflow preventer, and building water supply pipe on the site plan. 8. Provide complete water pipe calculations per Section 610.0, UPC, not Appendix A, UPC. Reference Section 610.4, UPC. 9. Show thermal expansion tank for water heater on the plans. |
| 03/17/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show size, routing and termination of drains from SF-1 and EF-1. 2. Show flue for water heater on plans. Show that the location of the flue conforms to the separation from the intake openings of SF-1 and EC-1 as required in Section 401.5.1, IMC. |
| 03/25/2003 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/31/2003 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Denied | See engineering and sanitation folders comments under "site- resubmittal" Building permit may not be approved prior to site plan approval. |
| 04/04/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 04/04/2003 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning will approve the building plans upon final approval of the site plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/11/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |