Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T02CM05232
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/24/2003 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | .. T02CM05232 .. 225 W AJO WAY .. 2/26/03 .. DGL ......... .. 1. CLARIFY THIS PERMIT IS FOR A ' CHANGE OF OCCUPANCY ' FROM EXISTING 'M'-RETAIL MECHANTILE TO 'A3'-ASSEMBLY FOR A CHURCH AND AS SUCH WILL BE BROUGHT INTO CONFORMANCE WITH THE IBC FOR AN 'A3' OCCUPANCY, PER IBC SEC 3405. ............................... .. 2. CLARIFY FOUR-HOUR FIRE-RATED WALLS AT EXTERIOR WALLS AS EXISTING DETAILS FOR PRIOR PERMITS INDICATE ONE-HOUR FIRE-RATED WALLS WERE PROVIDED AT THESE LOCATIONS. EXPLAIN WHAT HAS CHANGED OR 'IS', RESULTING IN FOUR-HOUR FIRE-RATED WALLS vs ONE-HOUR FIRE-RATED WALLS EXISTING. SHOW CONFORMANCE WITH IBC. ................... .. 3. DIMESIONALLY LOCATE AC UNITS ON SITE PLAN, SHOW EXITS AND EXITWAY IS NOT OBSTRUCTED BY AC UNITS OR OTHER OBSTRUCTIONS, REF DWG A1. ............ .. 4. PROVIDE ADEQUATE FINISH GRADE ELEVATONS TO SHOW CONFORMANCE WITH IBC CHAPTER 10, 11 AND 34 FOR EXITING, ACCESSIBILITY, PARKING, etc, REF DWG A1. ......................................................... ....................... .. 5. PROVIDE CORRECTED CODE REVIEW CHECKLIST : ........ ACCESSIBILITY CODE : IBC CHAPTER 11 AND 34 AND ANSI A117.1-1998ed vs ADAAG. ................................ ........ TYPE OF CONSTRUCTION : VN (NOTED ) NOT AN IBC DESIGNATION (SEE IBC CHAPTER 6). ........... ........ ... ....... BUILDING HEIGHT FT/ # OF STORIES : INDICATE BOTH HEIGHT IN FEET AND NUMBER OF STORIES , ACTUAL AND ALLOWABLE. ............................................. ....... ALLOWABLE BUILDING AREA : PROVIDE ALLOWABLE AREA CALCULATION PER IBC CHAPTER 5 FOR EACH BUILDING OR SEPARATED USE. ..................... ....... RESPOND TO EACH ITEM ON CODE ANALYSIS DATA 'CODE REVIEW CHECKLIST'. ........................................... .. 6. CLARIFY OCCUPANCIES AND REQUIRED SEPARATION OF OCCUPANCIES (HOURS) PER IBC TABLE 302.3.3: CLASSROOMS - 'B'-OCCUPANCIES, OFFICE -'B'-OCCUPANCY, CONFERENCE/MULTIPURPOSE ROOM -'A3'-ASSEMBLY, WORSHIP-'A3'-ASSEMBLY, STORAGE-"S1", SEPARATIONS : A3 TO S1 = THREE-HOUR FIRE-RATED SEPARATION, A3 TO B = TWO- HOUR FIRE-RATED SEPARATION, WITH APPROPRIATE OPENING PROTECTION. ................................................................. .. 7. DEFINE USES OF 'MULTI PURPOSE ROOM' FOR PROPER CLASSIFICATION OF OCCUPANCY AND DETERMINATION OF OCCUPANT LOAD FOR THIS ROOM. . .. 8. PROVIDE STRUCTURAL CALCULATIONS AND DETAILS FOR SUPPORT OF ROOF SUPPORTED EQUIPMENT ie: EXHAUST FANS, DUCTWORK, LIGHTING, SUSPENDED CEILING, etc, TO SHOW ROOF STRUCTURE IS NOT OVERLOADED AND EQUIPMENT IS PROPERLY SUPPORTED. .................................................................. .. 9. SHOW PREMISES IDENTIFICATION ON PLANS A1 AND ELEVATIONS TO INDICATE CONFORMANCE WITH IBC CHAPTER 5, SEC 501.2. .................................................. . 10. SHOW HOW ADDRESSING CONFORMS TO OR WILL BE BROUGHT INTO CONFORMANCE WITH PIMA COUNTY ADDRESSING ORDINANCE, SEE ATTACHMENT, REF DWG A1 AND ELEVATIONS. PROVIDE OFFICIAL ADDERSS SLIP. . 11. SEPARATE PERMIT REQUIRED FOR SIGNS. ............. . 12. PROVIDE COMPLETE BUILDING CODE DATA ON DRAWINGS. .................................................................... . 13. AS DESIGN IS FOR TWO BUILDINGS BASED ON SEPARATION, PROVIDE COMPLETE ALLOWABLE AREA CALCULATIONS FOR EACH BUILDING. SEE CHAPTER 5. ... . 14. EXPLAIN CHANGE OF CONSTRUCTION TYPE: FROM EXISTING 'IIN' NOTED ON RECORDS IN CITY FILE, TO DESIGN CONSTRUCTION TYPE USED FOR THIS PROJECT, PER IBC, ON DRAWINGS. ............................................... . 15. PROVIDE ADEQUATE DRAWINGS : BUILDING ELEVATIONS, CROSS-SECTIONS AND DETAILS TO SHOW WHERE MATERIALS ARE LOCATED, WHAT MATERIALS ARE USED, DETAILS OF HOW MATERIALS ARE SUPPORTED AND CONNECTED. ...................................... . 16. PROVIDE ADEQUATE DETAILS FOR FIRE-RATED CONSTRUCTION TO SHOW COMPLIANCE WITH IBC SEC 703, 704, 705, 706, 711, 712, 713, 714, 715, 716. .............. . 17. PROVIDE LISTING ON DRAWINGS FOR FIRE-RATED: ASSEMBLIES, SEALANTS, COMPONENTS, EQUIPMENT(PROVIDE COMPLETE COPY OF FIRE LISTING/S). .................................................................... . 18. CLARIFY INTERIOR FINISHES CONFORMANCE WITH IBC CHAPTER 8. ............................................................. . 19. PROVIDE AUTOMATIC FIRE SPRINKLERS IN WORSHIP AREA DUE TO OCCUPANT LOAD OF 476, PER 3332 SF SPACE, SEE IBC SEC 903 AND 1003.2.2. .............. . 20. CLARIFY POSTING OF OCCUPANT LOAD PER IBC SEC 1003.2.2.5 ON FLOOR PLAN, REF A2. ............................... . 21. SHOW EXIT SIGNS ON REFLECTED CEILING PLAN TO SHOW CONFORMANCE WITH IBC SEC 1003.2.10, ADDRESS MEANS OF EGRESS ILLUMINATION, PER IBC SEC 1003.2.11. ................................................................ . 22. INDICATE DOOR HARDWARE ON DRAWINGS PER IBC SEC 1003.3.1.8. ............................................................... . 23. DETAIL ON DRAWINGS CONFORMANCE WITH IBC SEC 11 AND 34 FOR ACCESSIBILITY. ................................ . 24. FULLY DETAIL TOILET FACILITIES FOR ACCESSIBILITY PER IBC SEC 1108 AND ANSI A117.1-1998ed. ................................................................ . 25. FULLY DETAIL CONNECTION OF NEW CONSTRUCTION TO EXISTING, INCLUDING FASTENER (TYPE,SIZE, SPACING/NUMBER) AND MATERIALS OF CONSTRUCTION. ............................................................. . 26. DETAIL GYP BD CEILING AT TOILET ROOMS, WALL TO CEILING CONNECTIONS. ............................................ . 27. ADDRESS STRUCTURAL ANALYSIS FOR EXISTING STRUCTURE TO SHOW CHANGE OF OCCUPANCY DOES NOT PUT STRUCTURE OUT OF CONFORMANCE WITH IBC CHAPTER 16 OR STRUCTURE WILL BE MODIFIED TO MAINTAIN BUILDING CODE CONFORMANCE. ............................................................. . 28. ADDRESS FIRE-RATING AT RECESSED FIRE EXTINGUISHER CABINET 2/A3. ........................................ . 29. CLARIFY AND DETAIL CORRIDOR PROTECTION FROM CONFERENCE ROOM TO EXTERIOR OF BUILDING, PER IBC SEC 1004.3.2. .................................................... . 30. PROVIDE COMPLETE CALCULATIONS FOR PLUMBING FIXTURES, ON DRAWINGS, PER IBC SEC 29. |
| 03/03/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/04/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 3/05/2003 Please provide copies of the orginally zoning approved plans for comparison purposes. |
| 03/06/2003 | WMARUM1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 03/06/2003 | WMARUM1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 03/06/2003 | WMARUM1 | WWM | REVIEW | Needs Review | |
| 03/06/2003 | WMARUM1 | WATER | REVIEW | Needs Review | |
| 03/06/2003 | WMARUM1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 03/06/2003 | WMARUM1 | FLOODPLAIN | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/06/2003 | BILL MARUM | OUT TO CUSTOMER | Completed |