Permit Number: T02CM05007
Parcel: 13329005A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T02CM05007
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/07/2003 JIM EGAN FIRE REVIEW Approved
02/12/2003 DAN CASTRO ZONING REVIEW Approved
02/12/2003 DOUG WILLIAMS FLOODPLAIN REVIEW Approved
02/24/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide natural gas pipe sizing calculations. Include gas pressures and developed pipe lengths on plans. Reference Section 1217.0, UPC 1994 with AZ State amendments.
2. Revise plumbing fixture unit schedule to conform to Table 7-3 footnote, UPC 1994 with AZ State amendments.
3. Provide an individual trap for each clothes washer and delete the 6"-trap shown serving each bank of clothes washers. Reference Section 1001.1, UPC 1994 with AZ State amendments.
02/24/2003 GERRY KOZIOL WWM REVIEW Approved
02/24/2003 ROBERT SHERRY WATER REVIEW Approved
02/24/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide exhaust ducts for 2 large dryers (Dryer Bank 2). Reference Section 504.1, IMC 2000.
2. Provide makeup air for dryers. Reference Section 504.5, IMC 2000.
3. Provide dryer exhaust termination per Section 504.4, IMC 2000.
02/27/2003 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approved
03/07/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied 1. Please verify that the dry cleaning operation uses no flammable fluids.
2. Regarding the 11.7A Stack Dryers. By my calculation that would be 1404 VA per phase, not 1217 or 1826. This effects the load on Panel A such that it appears to be drawing 199.4 A, not 171.
3. The correction above also effects load on Panel B. However, I calculate 155A, not 168. If 1404 VA is the correct VA, there appears to be opportunity to shift some load to Panel B from A.
4. Large Washers listed on Sheet E-1 as fed from Panel D, Ckts 2,4,6 and 8,10,12. Such is not the case on the Panel Schedule. It appears that one washer is powered on Ckt 1,3,5.
5. For Panel C, I calculate 97A, not 84A, which is close to the 100 A capacity.
6. In addition to the marking required in 230-66 and 230-70(b), please have the contractor install a sign at each service indicating that there is another power source for the building.
7. Provide fault current at Panels A & D, and calculations.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/10/2003 MONICA VALDEZ OUT TO CUSTOMER Completed