Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM04760
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/15/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
10/21/2002 | DAN CASTRO | ZONING | REVIEW | Denied | Building plans may not be approved by the Zoning Review Section until the site plan is approved by all sections. |
10/25/2002 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide Structural Calculations for cloud structure. See Sheet A3.6 2. Indicate wall glass assemblies to have a maximum of ¾" deflection per Chapter 24 IBC 3. Provide exit width calculations for exiting at hall 100. Include existing building in calculations. 4. Door at hall 100 encroaches into width of exit door. Clarify encroachment meets minimum width requirements per sections 1003.2.3.1.1 and 1003.3.1.1 of the IBC. 5. Provide handrail extensions for ramps at classrooms in corridor 104. Reference section 1003.2.1.3 IBC 6. Provide accessible means of egress from stage.If lift is to be used please detail on plans. Reference section 1003.2.1.3 IBC 7. Egress door at kitchen does not meet approach criteria reflected in Figure 404.2.4.1 ANSI 117.1. Revise plans 8. Provide occupant load calculations. Include total occupants to utilize plumbing fixtures as per Table 2902.1 IBC 9. Provide a typical detail for the mounting of accessible signs. 10. The hardware schedule within the project manual appears to be incomplete. Please specify on the door schedule doors to have panic hardware. Include doors that may be utilizing the "Main Exit" exception. Reference section 1003.3.1.8 IBC. 11. The two-hour firewall utilized for separation of buildings does not comply with the vertical continuity requirements of the IBC. Revise plans or provide allowable area calculations, including the existing building, showing compliance with the total area allowed. Reference section 705.6 IBC 12. Please clarify that skylight specifications reflect compliance with section 2405 IBC. 13. Note 53 on sheet A2.1 conflicts with design for one-hour fire barrier wall. Please clarify 14. A-3 to B occupancies requires a two-hour separation. Reference Table 302.3.3 IBC. Please address on plans |
10/28/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. A backwater valve will not be required, FFE= 34.6 and the MH Rim= 33.76. Remove detail 9/P2.1. |
10/28/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Provide a smoke detector in the return air Per Sec 606.2.1 IMC2000. 2. Provide a Type-I hood over the range Per Sec 507.2 IMC2000. 3. The exaust fan in the game room does not comply with Sec 101.2 IECC 1998. |
11/12/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/13/2002 | HOLLY PEARCE | WATER | REVIEW | Approved | |
11/15/2002 | GERRY KOZIOL | WWM | REVIEW | Approved | |
11/18/2002 | ANY | FLOODPLAIN | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/20/2002 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |