Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM04576
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/17/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Show load on Ckt 8. Panel calls for exterior lights, but no VA indicated. 2. Provide underground service, not overhead. 3. Provide lighting fixture schedule and cut sheets. 4. Heat pump loading on panel schedule and on overall load calculations do not appear to be multiplied by 1.25. 5. Provide conductor sizing for Ckts 12, 14. 6. If FLA for HP is 35.4 A total, the 30A fuse and CB may not allow it to start. 7. Provide IECC lighting power budget calculations. 8. Provide available fault current at service and panel, and brace accordingly. |
| 03/18/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/19/2003 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning will approve the building plans after the plans have been approved by the Commercial reviewers and also after final approval of the site plan. |
| 03/31/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1) Terminate condensate drains in accordance with Section 307.2.1, IMC as amended by the City of Tucson. 2) Revise the model energy code calculations to agree with the architectural drawings. |
| 03/31/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Modify waste riser diagram to conform to Section 908.0, UPC. 2. Modify the size of the vent through the roof to conform to Section 904.1, UPC. 3. Provide water calculation per Section 610.0, UPC. 4. Provide riser diagram for water. 5. Provide fixture count and description for both water and sewer. Include backflow prevention devices to be used in the water fixture schedule. 6. Provide site utility plan with upstream and downstream manhole rim elevations and inverts, sewer and water line sizes, location and size of RPBP assembly, and first floor elevation. 7. Provide detail of water heater installation, including excess pressure relief, expansion tank, recirculating pump and valves. Reference Section 302.3, Uniform Administrative Code 1994. 8. Show how the water heater installation complies with Section 511.0, UPC. 9. Potable water outlets with hose connections are required to comply with Section 603.3.6, UPC with AZ State amendments. 10. Provide roof drainage plans. Reference Appendix D, UPC. |
| 03/31/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/01/2003 | GERRY KOZIOL | WWM | REVIEW | Denied | See previous comments dated 3/19/03 |
| 04/04/2003 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Denied | Building Permit may not be approved prior to drainage report and site plan approval. |
| 04/23/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide methods of penetration protection of fire wall. Reference section 711 IBC. 2. A five-foot clearance around the water closet is required. Reference section 604.3 A117.1 ANSI. Revise plans 3. One-hour firewall to have integrity maintained from foundation through parapet. See section A sheet A02. Reference section 705.6 IBC. Clarify on plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/28/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |
| 04/23/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |