Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T02CM04516
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2002 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 09/27/2002 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
| 09/30/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 10/04/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 10/04/2002 | HOLLY PEARCE | WATER | REVIEW | Approved | |
| 10/04/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 10/15/2002 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Revise occupant load calculations to reflect 2000 IBC 2. Work proposed would be considered an alteration. Rehabilitation code sections specified on the plans for vertical protection do not apply. Please remove references from plans. 3. Plans indicate replacement of existing handrails. Please note on plan replacement of 50% or more of the handrail on a flight of stairs shall comply with the 2000 IBC. Replacement of less than 50% is allowed to match the existing handrail. Reference section 5:23-6.6(g.2) |
| 10/17/2002 | GERRY KOZIOL | WWM | REVIEW | Denied | Need to identify where basement lift station drains to (cannot drain to public sewer). |
| 10/21/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/22/2002 | LISA LESNY | OUT TO CUSTOMER | Completed |