Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02CM03758
Parcel: 113071850

Review Status: Completed

Review Details: RESIDENTIAL BLDG/ZONING/FLOOD/WWM

Permit Number - T02CM03758
Review Name: RESIDENTIAL BLDG/ZONING/FLOOD/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/08/2002 PATRICIA GEHLEN ZONING REVIEW Approved
08/08/2002 PATRICIA GEHLEN NPPO REVIEW Passed
08/08/2002 DOUG WILLIAMS FLOODPLAIN REVIEW Approved
08/20/2002 REYES ARVAYO BUILDING-RESIDENTIAL REVIEW Denied PLAN CHECK COMMENTS - PROJECT #T02CM03758

PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN.

SCOPE OF REVIEW:

THE SCOPE OF THIS PLAN REVIEW COVERS ARCHITECTURAL, PLUMBING, MECHANICAL, MODEL ENERGY AND ELECTRICAL CODES. ALL CODE REFERENCES ARE TO THE 2000 IRC AND STATE PLUMBING CODE. ALL FEATURES WERE CHECKED ONLY TO THE EXTENT ALLOWED BY THE SUBMITTALS PROVIDED. ALL PORTIONS OF THIS PROJECT ARE ASSUMED TO MEET OR WILL MEET OTHER DEPARTMENTAL REQUIREMENTS, CONDITIONS AND CONCERNS BEFORE PERMIT APPROVAL.

FOUNDATION PLANS:

1. NOTE ON THE DRAWINGS THE ALLOWABLE SOIL BEARING PRESSURE USED IN THE DESIGN OF THE FOOTINGS,
OR STATE THAT THE ASSUMED VALUE OF 1500 PSF IS BEING USED, PER TABLE R401.4.1, A SOILS REPORT IS
NOT REQUIRED. IT IS UP TO THE DESIGNER/HOMEBUILDER TO BE AWARE OF THE SOIL AND CONDITIONS OF
THE SITE. IF SOIL TESTING HAS BEEN DONE, A COPY OF THE SOILS REPORT SHALL BE SUBMITTED WITH THE
CONSTRUCTION PLANS, AND THE FOUNDATION DESIGN SHALL REFLECT THE SOILS REPORTS
RECOMMENDATIONS.

2. FOOTING WIDTHS FOR ONE-STORY, PER TABLE R403.1:
- 19" MINIMUM; HOLLOW CONCRETE/MASONRY

STRUCTURAL PLANS:

1. SPECIFY DESIGN CRITERIA ON PLANS. VALUES FOR , ROOF DEAD LOAD AND LIVE LOAD.

8. COMPLETELY DETAIL ALL CONNECTIONS AND CROSS-REFERENCE TO THE FOUNDATION AND FRAMING
PLANS:
- BEAM TO CMU WALL
- INTERIOR BEARING WALL TO RAFTERS

PLUMBING PLANS:

1. REFER NOTES AND FIXTURE UNITS TO 1994 U.P.C..

2. GAS: PROVIDE THE LENGTH OF LINE TO EACH APPLIANCE, BTU DEMAND OF EACH APPLIANCE, SIZE OF
EACH BRANCH, TOTAL DEMAND & TOTAL DEVELOPED LENGTH FROM METER TO MOST REMOTE
APPLIANCE ON THE SYSTEM PER UPC 1217.2

3. NOTE ON PLAN COMPLIANCE WITH WATER CONSERVATION; WATER CLOSETS 1.6 GALLONS PER FLUSH, SINKS
AND SHOWERHEADS 3 GALLONS PER MINUTE.

4. PROVIDE PRESSURE AND TEMPERATURE RELIEF VALVE AT WATER HEATER.

5. GAS FURNACE CAN NOT OPEN INTO BATH ROOM.

MECHANICAL PLANS:

1. GAS APPLIANCES SHALL COMPLY WITH CHAPTER 17 COMBUSTION AIR REQUIREMENTS. DETAIL HOW.

MODEL ENERGY CODE:

1. PROVIDE ENERGY CALCULATIONS PER THE 1998 IECC, OR COMPLY WITH IRC CHAPTER 11.
EXT. WALLS SHEATHING 4 ? FRAMING R? FLOOR ???


2. CALL OUT ON THE PLANS THE "R" VALUES OF INSULATION, AS WELL AS THE "U" VALUES OF THE WINDOWS
AND DOORS IN CONFORMANCE WITH THE ENERGY CALCULATIONS PROVIDED.

IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER:
REYES ARVAYO @ 791-5550 EXT. 1113
08/26/2002 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/29/2002 CINDY AGUILAR OUT TO CUSTOMER Completed