Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02CM03447
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/21/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide the correct formula for the beam deflection shown on sheet 1 of calc`s and run the computations. Check the deflection for total loads. 2) Specify the species, Commercial Grade, size classification and Grading Rules Agency per the 2000 IBC. 3) Seismic and Wind analysis shall be performed as per the 2000 IBC 7/18/2003 1) The clearance between the wood siding and earth shall be 6" or comply with section 2304.11.2.5. of the 2000 IBC. 2) Provide weep screeds. 3) Specify the roof diaphragm nailing. 4) How is the block at corner of the joist aqnd stud attached? 5) Specify the the thickness of the plywood on the roof. 6) Provide engineering calc`s for the 3/8" bolt at ledger or use ½" bolt. 7) Specify the width of the opening beween the storage and shop.Specify the size of beam over opening. Provide engineering to size it. 8) Specify the items to be stored in storage. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/05/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |
| 07/21/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |