| 07/17/2002 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 07/17/2002 | DAN CASTRO | NPPO | REVIEW | Passed | |
| 07/17/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 07/29/2002 | REYES ARVAYO | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN CHECK COMMENTS - PROJECT #T02CM03405 PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN. SCOPE OF REVIEW: THE SCOPE OF THIS PLAN REVIEW COVERS ARCHITECTURAL, PLUMBING, MECHANICAL, MODEL ENERGY AND ELECTRICAL CODES. ALL CODE REFERENCES ARE TO THE 2000 IRC AND STATE PLUMBING CODE. ALL FEATURES WERE CHECKED ONLY TO THE EXTENT ALLOWED BY THE SUBMITTALS PROVIDED. ALL PORTIONS OF THIS PROJECT ARE ASSUMED TO MEET OR WILL MEET OTHER DEPARTMENTAL REQUIREMENTS, CONDITIONS AND CONCERNS BEFORE PERMIT APPROVAL. FLOOR PLANS: 1. NOTE THAT BATHTUB AND SHOWER ENCLOSURES SHALL BE FINISHED PER p2710 WITH CERAMIC TILE, OR A LISTED ENCLOSURE, TO A HEIGHT OF 72" ABOVE THE DRAIN PER R702.4 AND R307.2 2. A ONE HOUR WALL IS REQUIRED BETWEEN UNITS. FOUNDATION PLANS: 1. NOTE ON THE DRAWINGS THE ALLOWABLE SOIL BEARING PRESSURE USED IN THE DESIGN OF THE FOOTINGS, OR STATE THAT THE ASSUMED VALUE OF 1500 PSF IS BEING USED, PER TABLE R401.4.1, A SOILS REPORT IS NOT REQUIRED. IT IS UP TO THE DESIGNER/HOMEBUILDER TO BE AWARE OF THE SOIL AND CONDITIONS OF THE SITE. IF SOIL TESTING HAS BEEN DONE, A COPY OF THE SOILS REPORT SHALL BE SUBMITTED WITH THE CONSTRUCTION PLANS, AND THE FOUNDATION DESIGN SHALL REFLECT THE SOILS REPORTS RECOMMENDATIONS. STRUCTURAL PLANS: 1. SPECIFY DESIGN CRITERIA ON PLANS. VALUES FOR , ROOF DEAD LOAD AND LIVE LOAD. 2. DETAIL 1- HOUR WALL BETWEEN UNITS. ELEVATIONS: 1. NOTE AND SPECIFY ALL ROOF SLOPES APPROPRIATE TO MATERIAL (SEE R905). PLUMBING PLANS: 1. NOTE AND SPECIFY ALL PIPING MATERIALS. 2. CLEAN OUTS REQUIRE ON FIXTURES 5' OR MORE FROM MAIN WASTE LINE 3. NOTE ON PLAN COMPLIANCE WITH WATER CONSERVATION; WATER CLOSETS 1.6 GALLONS PER FLUSH, SINKS AND SHOWERHEADS 3 GALLONS PER MINUTE. 4. NOTE ON PLANS THAT SHOWER AND TUB / SHOWER COMBINATIONS THAT HAVE INDIVIDUAL CONTROL VALVES SHALL BE OF THE PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE TYPE. MECHANICAL PLANS: 1. NOTE ON PLANS: MECHANICAL SHALL COMPLY WITH CHAPTERS 12 - 24 2000 IRC. 3. SHOW EXHAUST FAN LOCATIONS FOR BATHROOMS, WATER CLOSET COMPARTMENTS AND LAUNDRY ROOMS IN LIEU OF OPERABLE WINDOWS, PER R303.3 ELECTRICAL PLANS: 1. NOTE ON PLANS: ELECTRICAL WORK SHALL COMPLY WITH CHAPTERS 33 - 42, 2000 IRC. 2. INDICATE THE LOCATION OF ALL AIR CONDITIONING AND HEATING UNITS, AIR HANDLERS, COMPRESSORS AND DISCONNECTS. 3. WHERE CEILING FANS ARE SHOWN ON THE PLANS, PROVIDE A NOTE INDICATING ONLY APPROVED OUTLET BOXES SHALL BE USED, PER E4001.6. MODEL ENERGY CODE: 1. PROVIDE ENERGY CALCULATIONS PER THE 1998 IECC, OR COMPLY WITH IRC CHAPTER 11. 2. CALL OUT ON THE PLANS THE "R" VALUES OF INSULATION, AS WELL AS THE "U" VALUES OF THE WINDOWS AND DOORS IN CONFORMANCE WITH THE ENERGY CALCULATIONS PROVIDED. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER: REYES ARVAYO @ 791-5550 EXT. 113 |
| 08/01/2002 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/12/2002 | DELMA ROBEY | OUT TO CUSTOMER | Completed |