Permit Number: T02CM03390
Parcel: 13632002R

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T02CM03390
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/18/2002 JIM EGAN FIRE REVIEW Approved
07/18/2002 TOM CLARK WATER REVIEW Approv-Cond
07/24/2002 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Denied Mechanical 1. Incorrect Model Energy Code calculations submitted. ASHRAE/IES Sstandard 90.1-1989 with addenda f &m- Version 2.4 required. NOTE: Architectural drawings do not reflect any insulation. 2. Show on the plan how the mechanical design complies with Chapter 4 IMC 2000. 3. Provide an elevation view of the air handler and duct work on the plan. 4. Provide the size of the condensate line on the plan. NOTE: Equipment set on a cocrete pad shall comply with Sec 304.8 IMC 2000 ( 6" above grade).
07/24/2002 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Passed
08/07/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
Electrical Permit Requirements
(Include all that is applicable)

A. COMPLETE SINGLE LINE DIAGRAM OF SERVICE FOR TENANT & BUILDING
1. Voltage and phase.
2. Panel and/or transformer size.
3. Feeder loads
4. Rating breakers or fuses including A.I.C.
5. Complete fault current analysis
6. Total tenant and building service load
B. PROVIDE COMPLETE PANEL SCHEDULES:
1. Panel #, voltage, phase, location & withstand rating
2. Buss size, main
3. Circuit number
4. Breaker size, # of poles, & A.I.C. rating
5. # of lights, receptacles, or misc. each circuit by phase
6. Load in watts, each circuit by phase
7. Total connected load each phase (balance all phases to within 15%)
8. Add 25% for continuous load (lights, etc) and largest motor
9. Total KVA load
C. PROVIDE COMPLETE FLOOR PLANS:
1. Location of all outlets, fixtures, switches, appliances, panels, motors, disconnects, elec
equipment and service.
2. Assign circuit to each receptacle, light, appliance, meter, disconnect, elec equip & indicate
panel number on all home runs.
D. FIXTURE SCHEDULE AND FIXTURE CUT SHEETS
1. Fixture by letter or symbol
2. Number and wattage of lamps & total watts of fixture including BALLAST
3. Type of lamp (incandescent, fluorescent, etc.)
4. Type of mounting (flush, surface, etc.)
5. Fixtures must conform to lighting ordinance
E. 1998 IECC light budget calculations and luminaire switching.
08/07/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied GENERAL COMMENTS
1) Please return the plans I reviewed along with your next submission.
2) This plan is incomplete resulting in a partial review.
3) See "Electrical Permit Requirements" (attached) and revise plan to reflect conformance.
4) Provide an exterior lighting design in conformance with City of Tucson Lighting Ordinance for area B. This ordinance is available on line at www.cityoftucson.org/dsd.
Page 19 of 24
1) It is unclear how you intend to tap to the 400 amp parallel feeder to serve each of the classrooms. Provide a detail of the JB and taps depiction conformance with 99NEC 310-4.
2) Provide the UG JB dimensions.
3) Provide a scaled drawing.
Page 20 of 24
1) Provide a complete HVAC design. Include unit locations disconnect type and location, fuse sizes (as applicable), and conduit sizes. The panel schedules do not accurately reflect the mechanical design. See M-1 and M-2
2) The panel schedules give loads in amps however the column is described as kVA.
Page 21 of 24
1) The exit light must be connected to the non switched side of the lighting circuit serving the area. Currently there is no circuitry for the exit lights. See 99NEC 700-12(e)>
2) Provide circuitry for the exterior lighting.
3) Provide dual level switching for all areas except areas with only 1 luminaire, occupancy sensors, corridors, storage rooms, restrooms, and public lobbies. See 98IECC 705.2.1.
08/12/2002 PIMA COUNTY BUILDING-COMMERCIAL REVIEW Denied See attached comments.
08/16/2002 MVALDEZ1 ZONING REVIEW Needs Review
08/16/2002 JIM TATE FLOODPLAIN REVIEW Approved
08/16/2002 SEPTIC APPROVAL WWM REVIEW Denied

Final Status

Task End Date Reviewer's Name Type of Review Description
08/16/2002 LISA LESNY OUT TO CUSTOMER Completed