Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM03367
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/20/2002 | JIM EGAN | FIRE | REVIEW | Approv-Cond | |
08/20/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/20/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/20/2002 | HOLLY PEARCE | WATER | REVIEW | Approved | |
08/26/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E10101 1) Clarify the meaning of the segmented line with W's in between the line segments. The line begins at the propane area then travels in front of the control tower and explosion proof area. E2.1 1) Add a note "PROVIDE WORK CLEARANCE PER 99NEC 110-26" for keyed notes 6 and 9. 2) It appears the conduits attached to keyed note 11 should route to panel L1ARFF not H1ARFF. See page E6.1 panel L1ARFF for further clarification. E6.1 1) Notes 2G and 4 beneath FEEDER SCHEDULE require a #2 copper ground. See 99NEC 250-66 2) Circuit H1ARFF 8,20,12 serves a 75 kVA transformer however the load is depicted as 76,400 VA. Please clarify. GENERAL NOTES 1) Provide a complete electrical design for the interior propane training area. Include panel LRDP5, a grounding electrode system, necessary controls, motor disconnects and any additional required electrical. 2) Please return the plans I have already reviewed along with your next submission. They are highlighted in yellow. |
09/03/2002 | DAVE MANN | BUILDING-COMMERCIAL | REVIEW | Denied | Provide notes on Sheets S3.1 and S3.2 as redlined on the previous set of approved plans. Minimum hoizontal steel is required and vertical steel to continue to deck. |
09/24/2002 | DAN CASTRO | ZONING | REVIEW | Denied | See comments for site plan. |
09/26/2002 | GERRY KOZIOL | WWM | REVIEW | Denied | See comments on card. |
10/14/2002 | ELIZABETH EBERBACH | FLOODPLAIN | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/02/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |