Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM03020
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/27/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
10/03/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Provide screens for the overflow roof drains, showin detail 5/A7. |
10/03/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Model Energy Code calculations not with plan set. 2. Condensate line shall increase to 1" after second unit is attached to the line. |
10/03/2002 | HOLLY PEARCE | WATER | REVIEW | Approved | |
10/09/2002 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Structural Calculations to utilize the 2000 IBC per adopted ordinance by the City of Tucson. See masonry wall design 2. A portion of the structural calculations use soil bearing pressures exceeding 1500 psf. Revise calculations or provide a soils report for this project reflecting soil bearing pressures used. 3. Sheet A5 indicates ceiling height to be 7' plus in height with a 8" box beam encroachment. The minimum height allowed in occupied spaces is 7'6". Reference sections 1207.2 and 1207.2.1 of the IBC. Please clarify actual heights. 4. Sheet A4 indicates use of panic hardware on an exit door opening inward. Please clarify. 5. Proposed steel lintel varies in size and length from structural details 203/204 and structural calculations. Please clarify. |
10/17/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Please return the plans I have already reviewed along with your next submission. 1) The entire plan including print must be a minimum of 1/8" or 10 point. 2) Provide fixture cuts for fixtures G and F. Please note F fixture must have a minimum efficiency of 45 lumens/watt. 3) Provide IECC light budget calculations for the interior. USE PERMITTED W/FT2 AREA FT2 WATT/FT2 TOTAL ACTUAL Banking 2 1689 3,378 Connected Watts Office 1.8 100 180 RR .8 128 102 Storage 1 78 78 Lounge 1.8 260 468 Corridors 08 215 172 2,470 4,378 5,346 4) The service design is indicated to be existing. Please clarify. |
10/28/2002 | GERRY KOZIOL | WWM | REVIEW | Approved | |
10/29/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Denied | A copy of the approved Site Plan must be included with the submittal. |
10/30/2002 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 10/30/2002 Building plans may not be reviewed until the site plan is approved. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/01/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |