Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T02CM02694
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/08/2004 | DAN CASTRO | ZONING | REVIEW | Denied | COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Per LUC Sec. 3.2.6.4 perimeter yard indicator "DD", a 21 foot building setback is required from the north property line to the proposed building. D.S. 2-02.2.1.A.7/ L.U.C. 3.2.6.4 2. Since a variance will be applied for loading zone screening requirments and the above building setback deficiency, please list the case number, date of approval, variances granted, and conditions imposed on both existing and future site plans. A copy of the recorded MS&R covenant must be submtted prior to site plan approval. Right-of-way widening stamp to be placed on the site plan. If you have any questions about this transmittal, please call Dan Castro at (520) 791-5608. Be sure to include the red-lined copy site plans upon resubmittal. |
| 10/08/2004 | LLESNY1 | NPPO | REVIEW | Needs Review | |
| 10/08/2004 | LLESNY1 | ENGINEERING | REVIEW | Needs Review | |
| 10/08/2004 | LLESNY1 | LANDSCAPE | REVIEW | Needs Review | |
| 10/08/2004 | DAN CASTRO | HANDICAP-SITE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/08/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |