Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02CM02446
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/13/2002 | MATT FLICK | FLOODPLAIN | REVIEW | Approved | Floodplain: Previously reviewed and approved by Doug Williams on June 10 for site plan purposes. |
| 08/15/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | See comments made on May 31,2002. |
| 08/15/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | See comments made on May 31,2002. |
| 08/30/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/12/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/19/2002 | DAVE MANN | BUILDING-COMMERCIAL | REVIEW | Denied | This is a commercial project and all drawings should be prepared under the direction of an appropriate licensed professional and sealed and signed by them. SH D2 Site Plan · Remove ramp from access aisle. (See Sec. 502.4, ICC/ANSI A117.1-1998) Detail access to concrete walk from disabled access aisle. · All units shall be accessible to the disabled. SH A1 Floor Plan · All dwelling units shall be Type B accessible units in accord w/ Sec. 1107.5.4, IBC 2000, revise accordingly, (See Section 1003, ICC/ANSI A117.1 - 1998) · Provide professional seal and signatures for all disciplines. SH S1 continued · Provide head, jamb, and sill details with windows. SH S2 COLLAR BEAM CONNECTION · Verify design based upon size of window opening SECTION B · At primary entrances, dimension from top of threshold to finish floor and exterior landing as ½". |
| 09/20/2002 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 8/29/02 Building plans may not be reviewed until the site/landscape/NPPO plans have been approved and are included in the submittal package |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/04/2002 | ELAINE ROSE | OUT TO CUSTOMER | Completed |