Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02CM02316
Parcel: 125091980

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T02CM02316
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/09/2002 JIM EGAN FIRE REVIEW Approved
05/09/2002 MIKE BERGHUIS FLOODPLAIN REVIEW Approved
05/10/2002 INGA DAVIDSON WATER REVIEW Passed
05/17/2002 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Denied Plumbing See application.
05/17/2002 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Denied Mechanical See application.
05/24/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied GENERAL COMMENTS
1) Provide an electrical site plan and interior floor plan as needed. Plan should include the location of all new and existing electrical equipment relevant to this project.
E1
1) Roof top receptacles must be GFCI protected. 99NEC 210-8
E2
1) Identify and provide a complete electrical description for the new switchboard.
2) Provide the amperage rating and component short circuit current rating for the PME.
3) Provide a grounding electrode system for the new 225 kVA transformer. 99NEC 250-24. In addition the equipment bonding jumper should be removed between the transformer and the new switchboard as it will now be in parallel with the neutral.
E3
1) Circuit P4-14 should only show loads on 2 phases as AC-26 is single phase. See page M8.
2) Circuits P4-8 and P4-9 serving AC's 20a and 20b should have an FLA less than the AC MCA of 44.1 amps. Currently the load shown in the panel is larger than the circuit breaker protecting the conductors. See page M8
06/06/2002 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied SEE COMMENTS ATTACHED TO APPLICATION.
06/10/2002 GERRY KOZIOL WWM REVIEW Passed
06/10/2002 PATRICIA GEHLEN ZONING REVIEW Denied 06/10/02 - Zoning - please provide an elevation with the height of the proposed roof mounted equipment (from design grade) to ensure compliance with height restrictions of the LUC.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/10/2002 LISA LESNY OUT TO CUSTOMER Completed