Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM02284
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/07/2002 | JIM EGAN | FIRE | REVIEW | Approv-Cond | |
05/07/2002 | RONALD ENGELKES | WATER | REVIEW | Approved | |
05/16/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. A smoke detector shall be installed in the return air duct of AC-1 Per Sec606.2.1IMC2000. 2. Show on the plan how the kitchen exaust complies with Sec508.1IMC2000. |
05/16/2002 | PATRICIA GEHLEN | ZONING | REVIEW | Approved | |
05/16/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Why would a backwater valve be required under the 1994UPC Az. Code? 2. Gas line can not be installed under slab and roof Sec1211.3UPC1994Az.Code. 3. Could find only 2ea P-6 lav's on the plan. |
05/21/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | GENERAL COMMENTS 1) See the red line set in addition to my written comments for further clarification. 2) Provide IECC Light budget calculations. 3) Please return the redline set along with your next submission. This will assist in my second review. E0.1 1) Provide fixture cuts and catalog numbers for luminaires K, U, Q. E2.1 1) HS 32 serving TU2 and TU3 should be HS-30. 2) A receptacle with a circuit number 14 is connected to LS-12, 22. 3) Provide a minimum 60 amp disconnect for AC-1. 99NEC 440-12(b)(2). 4) Circuit LS-26 serving EF1 and EF4 should be circuited to LS-30. 5) A receptacle with a #16 adjacent to it should connect to circuit LN-29 6) A receptacle with a #16 adjacent to it should connect of circuit LN-18. 7a) CU-1 requires a 208/1 phase connection with a load of 9.6 amps (1997 VA). 7b) This requires circuiting CU-1 to LS 31,33, and the door operator to circuit LS 35 on the plan and in the panel schedule. E2.2 1) Provide dual switching everywhere except areas with only 1 luminaire, occupancy sensors, corridors, storage rooms, restrooms, and public lobbies. See 98IECC 705.2.1 2) 2000IBC 1003.2.11.2 (4) requires emergency lighting on the exterior exit discharge immediately adjacent to the exit discharge. E8.1 1a) Panel LS has a 175 amp MCB on page E8.1 and a 225 amp MCB on E8.2. 1b) Panel HS has a 70 amp circuit breaker for the transformer on page E8.1 and a 100 amp circuit breaker on page E8.2. 3) Circuit HS 37,39,41 describes a 45 kVA transformer on page E8.2 the one line describes it as a 75kVA. 4) Provide a 30 amp circuit breaker and #10 wire for HS 14,16,18. 99NEC 424-3(b) E8.2 1) The main service has a fault at its line terminals of 42,246 amps however it is only braced for 32,600 amps. 2) Identify the A/Cs as AC#1 and AC#2. |
06/25/2002 | PHIL SEADER | BUILDING-COMMERCIAL | REVIEW | Denied | |
06/26/2002 | GERRY KOZIOL | WWM | REVIEW | Approved | |
06/26/2002 | MIKE BERGHUIS | FLOODPLAIN | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/12/2002 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |