Permit Number: T02CM02114
Parcel: Unknown

Address:
4410 S PARK AV

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T02CM02114
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/29/2002 JIM EGAN FIRE REVIEW Approved
05/08/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied See redline set for additional clarification.
Please return the redline set along with your next submission.
E.0
1) Provide a fixture cut for "E". This fixture must have a flat flush lens pointed straight down.
E.1 & E.7
1) Please provide the footing and pole design for the parking lot fixtures as part of this project. This will eliminate possible confusion and error in the field.
E.4
1) Provide a circuit number for the fixtures located in rooms132,134,135,136,137,138,139, and 140.
2) Provide dual switching in accordance with 1998 IECC.
E.5
1) Provide a load and circuit in Panel "L1" for circuit 19,21,23 (FC-1 and FC-2). The Total load is 4 amps at 460V 3 phase.
2) EF1 is a 1 phase 350 Watt 115V machine. The plan provides circuits P1-2,4 and a 30 amp 3P. disconnect. In addition add a load in the panel. See EF-2 circuit P1-2 for similar concerns.
E.6
1) The feeder to "L1" is too small. The circuit breaker is 225 amp therefore provide a minimum 4/0 copper conductor. 99NEC 240-3, 310-16
2) The design for FC-1 and 2 does not match page E.5. See page E.5 and M-2 for appropriate design parameters.
3) Provide a fault current analysis for panel "L1"
4) Provide IECC light budget calculations. See calculations below. Calculations indicate the design does not meet minimum requirements.
5) Provide the control voltage for the CU and FC units. If it is line voltage (120 or greater) provide a control disconnect adjacent to the CU and FC starters. 99NEC 430-74.

Room W/ft2 allowed Total ft2 Total W/ft2 allowed Actual W/ft2
Exercise 1.0 716 716 1440
Mech. 1.0 192 192 128
Debriefing 1.8 580 1044 768
Storage 1.0 180 180 192
Lockers 1.0 120 120 52
Corridor .8 215 172 234
2003 2424 2814
05/14/2002 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Approved
05/14/2002 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Denied Mechanical 1. Return air from corridor (rated) does not comply with Sec601.2IMC2000 2. Fire/smoke dampers required for rated corridors.
05/21/2002 PHIL SEADER BUILDING-COMMERCIAL REVIEW Denied A2.4 DOOR SCHEDULE - DOORS 137 & 138 SHOULD BE 20 MINUTE LABELED DOOR ASSEMBLIES.. A6.4 EXTEND NORTH AND EAST PARTITIONS OF JUVENILE HOLDING ROOMS AS I HOUR RATED PARTITIONS. VERIFY 1 HOUR ROOF CONSTRUCTION @ 1 HOUR RATED CORRIDOR. (CAN BE ACHIEVED WITH 2 LAYERS OF TYPE "X" GYP. BD.
05/30/2002 GERRY KOZIOL WWM REVIEW Approved
05/30/2002 MIKE BERGHUIS FLOODPLAIN REVIEW Approved
05/31/2002 FRANK KALINSKI WATER REVIEW Approved
05/31/2002 DAN CASTRO ZONING REVIEW Denied See comments for site review.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/31/2002 TAMI ACHONG OUT TO CUSTOMER Completed