Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T02CM01870
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/11/2002 | DAN CASTRO | ZONING | REVIEW | Approved | |
04/29/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
05/03/2002 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/06/2002 | FRANK KALINSKI | WATER | REVIEW | Approved | |
05/13/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1) Please describe the outside luminaires. Note all exterior lighting must conform with the light pollution ordinance and the IECC energy ordinance. 2) Provide circuit numbers for the luminaires. 3) Provide individual loads in the panel. 4) Provide wire and conduit sizes for the power outlet serving the cart. 5) Provide a complete description of the luminaires used interior to the space. In addition provide IECC light budget calculations. 6) Circuits 6/8, 10/12, 14/16, 18/20, required special purpose receptacles rated a minimum of 30 amps. 7) Provide a Midwest cooler box (or equal) for the evaporative cooler. 8) The power plan includes the words "PANEL A" on the east wall of the storage room. Please clarify. 9) Provide a minimum of a #4 copper grounding electrode system. 10) Change the reference 250-80 to 250-50 and 250-104. 11) Revise all NEC references in the specification to reflect the 1999 NEC. As an option you may remove the references that do not pertain to this of project. |
05/13/2002 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Approved | Plumbing 1. Provide a civil site plan showing connection to the public sewer, MH Rim elev. & F.F.E. 2. Provide a waste line isometric drawing. 3. enting does not comply with Sec904.4 & 905.3 UPC 1994 Az. Code. |
05/13/2002 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Approved | Mechanical 1. Show on the plan how the building complies with the M.E.C. |
05/15/2002 | MIKE BERGHUIS | FLOODPLAIN | REVIEW | Approved | |
05/17/2002 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/22/2002 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |