Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T02CM01652
Parcel: 11931013C

Review Status: Completed

Review Details: RESIDENTIAL BLDG/ZONING/FLOOD/WWM

Permit Number - T02CM01652
Review Name: RESIDENTIAL BLDG/ZONING/FLOOD/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/29/2002 BLANCA ESPINO FLOODPLAIN REVIEW Denied SITE PLAN
1. Site Plan clearly marked as "SITE / GRADING PLAN"
2. Indicate cut and fill quantities in cubic yards.
3. Stamped approved by Civil Engineer if cut and fill exceeds 5,000 cubic yards.
4. The portions of the site or lot to be left ungraded are to remain undisturbed and are not to be used for stockpiling of materials or excess fill, construction vehicle access, storage of vehicles during construction, or similar uses. If natural areas are designated on a site or lot, temporary fencing will be installed where they abut construction areas in order to prevent encroachment into the natural areas.
5. Special Grading Notes:
* HDZ 1. Show Gradable area
2. Show Limits of grading
6. Identify roof drainage direction

ELEVATIONS
1. Finish floor elevations and pad elevations
2.
FLOODPLAIN

1. Delineate 100-year w.s.e./floodplain/erosion hazard setback
2. Top of banks (20 ft. maintenance easement - 50 ft. study area)
3. Call out Name of wash

SLOPE

1. Slopes of 3H:1V require vegetation
2. Slopes of 2H:1V require hand placed riprap
3. Slopes of 1H:1V or greater requires grouted riprap

DRAINAGE

1. Drainage patterns with percent slopes (Show patterns within the first 110 feet from P.L.)
2. Check velocity peak discharge velocity for potential erosion
3. Show details of all surface and subsurface drainage devices



NOTE: If approved plans limit grading areas because of HDZ, ERZ, SCZ or rezoning conditions - clearly designate "no disturbance areas," type of barrier to be used during construction and grading, and note that Landscape Inspector must inspect barrier location before any grubbing or grading commences. All Plans must conform to the Native Plant reservation Ordinance.
07/29/2002 BLANCA ESPINO ENGINEERING REVIEW Denied SEE FLOOD FOLDER.
07/30/2002 PATRICIA GEHLEN ZONING REVIEW Denied zoning 7/30/2002
see comments on copy of card.
08/05/2002 MVALDEZ1 NPPO REVIEW Needs Review
11/14/2002 GP BUILDING-RESIDENTIAL REVIEW Approved
11/26/2002 SEPTIC APPROVAL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
11/27/2002 TAMI ACHONG OUT TO CUSTOMER Completed