| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/29/2002 | BLANCA ESPINO | FLOODPLAIN | REVIEW | Denied | SITE PLAN 1. Site Plan clearly marked as "SITE / GRADING PLAN" 2. Indicate cut and fill quantities in cubic yards. 3. Stamped approved by Civil Engineer if cut and fill exceeds 5,000 cubic yards. 4. The portions of the site or lot to be left ungraded are to remain undisturbed and are not to be used for stockpiling of materials or excess fill, construction vehicle access, storage of vehicles during construction, or similar uses. If natural areas are designated on a site or lot, temporary fencing will be installed where they abut construction areas in order to prevent encroachment into the natural areas. 5. Special Grading Notes: * HDZ 1. Show Gradable area 2. Show Limits of grading 6. Identify roof drainage direction ELEVATIONS 1. Finish floor elevations and pad elevations 2. FLOODPLAIN 1. Delineate 100-year w.s.e./floodplain/erosion hazard setback 2. Top of banks (20 ft. maintenance easement - 50 ft. study area) 3. Call out Name of wash SLOPE 1. Slopes of 3H:1V require vegetation 2. Slopes of 2H:1V require hand placed riprap 3. Slopes of 1H:1V or greater requires grouted riprap DRAINAGE 1. Drainage patterns with percent slopes (Show patterns within the first 110 feet from P.L.) 2. Check velocity peak discharge velocity for potential erosion 3. Show details of all surface and subsurface drainage devices NOTE: If approved plans limit grading areas because of HDZ, ERZ, SCZ or rezoning conditions - clearly designate "no disturbance areas," type of barrier to be used during construction and grading, and note that Landscape Inspector must inspect barrier location before any grubbing or grading commences. All Plans must conform to the Native Plant reservation Ordinance. |
| 07/29/2002 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | SEE FLOOD FOLDER. |
| 07/30/2002 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | zoning 7/30/2002 see comments on copy of card. |
| 08/05/2002 | MVALDEZ1 | NPPO | REVIEW | Needs Review | |
| 11/14/2002 | GP | BUILDING-RESIDENTIAL | REVIEW | Approved | |
| 11/26/2002 | SEPTIC APPROVAL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/27/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |