Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02CM00839
Parcel: 133110010

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T02CM00839
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/11/2002 DAN CASTRO ZONING REVIEW Approved
02/11/2002 MBERGHU1 FLOODPLAIN REVIEW Approved
02/20/2002 JIM EGAN FIRE REVIEW Approved
02/26/2002 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approv-Cond
02/28/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied E2
1) Keynote 7 requires a #6 equipment ground. 99NEC 250-122
2) Provide a #6 equipment ground throughout the circuit typical 5 places. Typical for the lighting, scoreboard, and receptacle circuits. 99NEC 250-122
3) Field #1 load appears incorrect. Utilizing a Lithonia High Power Factor fixture the 1500 watt metal halide fixture draws 3.5 amps at 480 volts. Utilizing the phase layout provided, the total B and C phase current at 125% is approximately 64 amps. The Musco specifications do not indicate a disconnect at the pole thus the design appears to be in violation of 99NEC 210-23(d) which prohibits circuits larger than 50 amps for lighting circuits.
E3
1) Provide a #6 equipment ground for the receptacle and scoreboard circuits originating from panel 'SSL'.
2) It appears the circuit from PB#7 to senior field #5 pull box should be 3#2,1#6 gnd and 8#6, 3#6 gnd. In addition the circuits from the control panel to PB#7 should be 3#2, 1#6 gnd. 99NEC 250-122
3) The service drawing indicates a 60 amp fuse for the lighting circuit. See comment E2 #3 above.
E4
1) The service load calculations do not appear to be correct. How is it that you deducted the loads for fields 2 and 3 from the total load? In addition the field #1 lighting load for this project appears incorrect.
3) Provide fixture cuts, and place the appropriate catalog numbers on the plan.
E5
1) The field #1 load appears incorrect.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/04/2002 MONICA VALDEZ OUT TO CUSTOMER Completed