Permit Number: T02CM00555
Parcel: 141016770

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T02CM00555
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/15/2002 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approv-Cond
04/18/2002 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Denied Plumbing 1. Waste line Ismetric drawing does not comply with Sec 909 UPC 1994 Az. Code and the manufactures installation instructions. 2. Provide a water demand calculation on the plan.
04/18/2002 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Passed
04/18/2002 PATRICIA GEHLEN ZONING REVIEW Denied
04/23/2002 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied SECOND REVIEW
E-1 SERVICE
SEE RED LINE SET FOR ADDITIONAL INFORMATION
1) OK
2) OK
3) OK
4) Provide TEP AFC to POA . The downstream panel boards must be
listed/labeled series rated for the highest fault at their line terminals. This must be noted along with the line terminal fault current on the plan.
NEW: Let through values may not be used. Please see red line set for additional commentary.
5) OK
6) Provide the line side conductor sizes for the service disconnects. Note: If an equipment bonding conductor on the line side of the disconnect is installed you must use 99NEC 250-66 for appropriate sizing. See 99NEC 250-102(c).
NEW: The 600kcmil service entrance conductor requires a minimum 1/0 copper equipment bonding jumper. See red line set, and comment above for additional information.
E-3
1) The piping serving the 'C' fixtures must be a minimum of 5' from the inside wall of the pool. 99NEC 680-10
NEW: Comment not addressed. See redline set for clarification.
2) OK
3) OK
4) Indicate by note the #2 copper bond be routed back to the pool equipment and pool cover motor per 99NEC 680-22(a)(4).
NEW: See red line set for clarification.
5) OK
NEW COMMENTS April 23, 2002
1) PG E-3 It appears the restrooms and pool equipment should circuit to panel PP not PH as shown.
2) PG E-1 Provide the loads individually in PP panel schedule.
05/01/2002 DOUG WILLIAMS FLOODPLAIN REVIEW Denied Provide approved Development Plan with submittal - the approved Development Plan may be walked through for Site approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/03/2002 MONICA VALDEZ OUT TO CUSTOMER Completed