Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU03170
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2002 | LOREN MAKUS | NPDES | REVIEW | Denied | 1.Describe the nature of the construction activity. Give a brief description of the finished project such as "An office complex of 5 buildings and paved parking. 2.Provide the run-off coefficient for preconstruction conditions. 3. Identify the receiving water including identification of the immediate discharge location. 4. Provide a copy of the general permit language. 5. Show and describe structures used to divert stormwater, including the diversion swale on the southeast corner of the project. Include information concerning the timing of its construction and the installation of riprap. 6. In the sequence of major events include all major soil disturbing activities. For each activity, indicate which controls will be appropriate for the expected conditions and the timing for implementing and removing the controls. 7. Describe structural and administrative controls that will be used to prevent solid material such as construction waste and litter from becoming pollutants. 8. Provide for updates of inventory of materials to be stored on site. 9. Provide a description of the spill prevention and control plan. 10. Indicate the areas that will not be disturbed by construction activities. 11. Identify watercourses that are adjacent to the site. 12. Provide descriptions of temporary and permanent stabilization practices that will be used and indicate their locations on the plan. 13. Provide a schedule of implementation for all control measures relative to the major soil disturbing activities. 14. Provide a log for recording dates when major grading activities occur and when construction activities cease. 15. Provide a description of vehicle maintenance procedures. 16. Describe the required information that must occur on inspection reports. ( Name and qualifications of the inspector, date of the inspection, major observations, indication of whether sediment removal is required, description of maintenance or alterations required, certification statement.) 17. Indicate that the plan will be updated as necessary. 18. The stormwater plan indicates that the drainage basin will be used as a sediment trap, but no drainage basin is indicated on the plan. 19. Submit three copies of the revised plan. |
| 01/13/2003 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering Review, 01/28/2003: 1- Provide the Subdivision Plan number. 2- Provide the project administrative address. 3- Provide the parcel dimensions and bearings. 4- Label Laurel Avenue as "Public". 5- Provide dimensions and radii for all proposed islands and planting beds. |
| 01/28/2003 | LAITH ALSHAMI | FLOODPLAIN | REVIEW | Denied | Laith Alshami, Floodplain review, 01/28/2003: 1- Call out any perimeter walls if applicable. Walls in floodprone areas must have wall openings. 2- Show roof drainage direction and provide scuppers for the roof drains under the walkways adjacent to the proposed structures. |
| 01/30/2003 | PATRICIA GILBERT | NPPO | REVIEW | Approved | |
| 01/30/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Engineering, Floodplain and NPDES approvals required for Zoning review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/04/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |