Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU03061
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2003 | JOE LINVILLE | NPPO | REVIEW | Denied | Approved NPPO Plan required. |
| 01/02/2003 | MSTPAUL1 | NPDES | REVIEW | Passed | |
| 12/20/2002 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site plan approval required. |
| 12/23/2002 | JIM TATE | ENGINEERING | REVIEW | Denied | The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and floodplain comments have been addressed. 1. A copy of the stamped approved Site Plan must be included with the Grading Plan submittal. 2. Sidewalks must be flood free for up to the ten year event. The plan does not show how proposed roof drainage will be routed under the proposed sidewalks that are adjacent to the buildings. Scuppers have been provided on the south side of the north building. How is it intended to route roof drainage under the sidewalks on the north side of both buildings? 3. The Grading Plan shows a weir length of 26". The Drainage Report specifies a weir length of 1.667 ft. Correct one or the other. 4. Include the address on the plan (327 W. King Rd.). |
| 12/23/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Denied | See Engineering folder. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/14/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |