Permit Number: T02BU03011
Parcel: 120072150

Address:
4120 S 6TH AV

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU03011
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/17/2003 JOE LINVILLE NPPO REVIEW Denied An approved site plan and native plant preservation is required. Upon review of approved plans additional comments and inspection requirements may apply.
02/07/2003 EROSE1 NPDES REVIEW Passed
02/07/2003 PAUL MACHADO ENGINEERING REVIEW Denied To: Esquema Architecture
Ygnacio A. Coppola P.O. Box 41644
Tucson, Arizona 85717

SUBJECT: 4120 S. 6th Avenue.
Grading plan T02CM03011 (First Review) T14S, R13E, Section 36

RESUBMITTAL REQUIRED:Grading Plan and Drainage Report.

The Grading Plan (GP) and Drainage Report (DR) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:

1. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23.
2. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting"
3. Provide/Add the basin maintenance responsibility per 2.3.1.6 C 1 and 2.
4. List all Cut and Fill quantities in cubic yards. If both are 0 cy, please list.
5. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed.
6. Show details of all surface materials.
7. Show the 100-year flood peak discharge.
8. Slopes of 2H: 1V or greater require grouted riprap.
9. Cut or fill slopes require a 2' minimum setback from property line.
10. Drainage patterns with percent slopes (Show patterns within the first 100 feet from the property line).
11. Flow arrows, grades and flow rates within and adjacent to site to show drainage scheme.
12. Call out peak discharges entering and exiting the site.
13. Complete the bearing in the Basis of Bearing note.






Drainage Report:
1. There is no construction allowed in the existing or future right-of-way, i.e. the Ret/Det basin cannot be placed in the R/W. Please revise DR to reflect this criteria.
2. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed will suffice.
3. In the retention basin detail inn the drainage report figure, the detail calls out a scupper in the basin. Please address.
4. Complete the bearing in the Basis of Bearing note.

If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us
Paul Machado
Senior Engineering Associate,
02/07/2003 ANY FLOODPLAIN REVIEW Approved
12/31/2002 DAVID RIVERA ZONING REVIEW Denied Engineering, floodplain, NPPO and site plan approval required for Zoning review.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/27/2003 ANGIE SHOFFSTALL OUT TO CUSTOMER Completed