Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02BU02470
Parcel: Unknown

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU02470
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/24/2002 LOREN MAKUS NPDES REVIEW Denied Provide schedule of construction. The Table of Contents lists this as Appendix C which is empty.
Provide for an ongoing inventory of potential pollutants.
11/05/2002 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering Comments, 11/05/2002

1- Provide in the Title Block, the subject project Administrative/Site Address.
2- Add "n" to the word "meadering" on all sheets.
3- General Note 2 duplicates Grading Note 6. Revise.
4- General Note 14 duplicates Grading Note 10. Revise.
5- Add the inch symbol (") to the number (1/2) in Grading Note 19.
6- Provide the subject parcel dimensions and bearings.
7- Lots 1-16 do not comply with the differential grading requirements. Revise as necessary.
8- Show slope stabilization on details K/3 and I/3.
9- The subgrade in detail D/3 should be compacted to a minimum of 95% before the installation of the stabilized DG.
10- Additional comments may be offered after the approval of the Drainage Report and the Tentative Plat.
11/05/2002 LAITH ALSHAMI FLOODPLAIN REVIEW Denied Laith Alshami, Floodplain Comments, 11/05/2002

1- Provide construction details for all proposed detention/retention basins including dimensions.
2- Show the bleed pipe in Basin "A" on sheet 2/3.
3- Show detention basins maintenance ramps as required by the detention/retention manual.
4- Provide all construction dimensions on details M/3 and J/3.
5- In order for the proposed grouted riprap to work properly without requiring extensive and costly maintenance in the future, the concrete thickness should be at least 8" for riprap size D50=6". Revise accordingly.
11/12/2002 PATRICIA GILBERT NPPO REVIEW Denied ....
11/12/2002 MICHAEL ST. PAUL ZONING REVIEW Denied Engineering, Floodplain, NPDES and NPPO approvals required before Zoning review.
11/12/2002 PATRICIA GILBERT NPPO REVIEW Denied Comments of 11/06 are superceeded by the following:

Approval of the tentative plat is required prior to grading plan approval.

Please add a general note stating that all work must conform to the approved Native Plant Preservation Plan.

A pre-permit inspection will be required prior to permit issuance. Please call to schedule the inspection at 791-5640 ext. 1140 upon approval of the grading plan.

Per LUC 3.7.5.2.E:"Cut and Fill. Exposed cut or fill slopes shall be no greater than a one (1) foot rise or fall over a three (3)foot length." Revise the plans and details to clarify compliance with the code section.

Identify and dimension the scenic route buffer areas on the grading plan. LUC 3.7.5.2

Final Status

Task End Date Reviewer's Name Type of Review Description
11/12/2002 TAMI ACHONG OUT TO CUSTOMER Completed