Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU02315
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/03/2002 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Steve M Magelli, P.E. Grading Plan (T02BU02315) 242 N. 2nd 7000 E Tanque Verde Rd., Ste. 37 SUBJECT: Stone Ridge II, Grading plan T02BU02315 (First Review) T14S, R15E, Section 15 RESUBMITTAL REQUIRED: GP The Grading Plan (GP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. Add Administrative/Site address on the cover sheet. 2. Add note "All grading shall conform to the latest edition of the 2000 IBC" 3. Provide basin maintenance responsibility note to general grading notes. 4. A private improvement agreement may be necessary for work performed within the Right-of-way. Contact Department of transportation at (520) 791-4249. 5. Provide note "Depress landscaped areas a maximum of 6" for water harvesting". 6. List cut and fill quantities. 7. Show FFE to the West side of the property. 8. Show two cross sections of the basin perpendicular to each other. 9. Provide pedestrian barriers adjacent to detention basin. 10. Call out the length of the scupper in front of the detention basin. 11. Provide a sidewalk scupper for the interceptor channel between lots 34 and 35. 12. The call out letter at the interceptor channel should be "E" not "D". If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate, C:\Stone Ridge II grading |
| 10/03/2002 | PAUL MACHADO | FLOODPLAIN | REVIEW | Approved | |
| 10/04/2002 | LOREN MAKUS | NPDES | REVIEW | Denied | Include construction of houses in the sequence of major events. Provide the run-off coefficient for preconstruction conditions. Identify the receiving water for all discharges from the project site. Include a copy of the permit requirements Provide for updates to the materials inventory. Indicate areas that will not be disturbed and show how they will be delimited to prevent inadvertent disturbances. Provide a description of temporary, interim and permanent stabilization practices for areas that are not to be paved. Discuss the timing for application of ABC to areas that are to be paved. Discuss the timing for removal of the stabilized construction entrances. Describe the erosion and sediment control (ESC) activities that will occur between the start of paving and completion of home construction. Provide for recording of dates that major grading activities occur and dates when construction activities cease (permanently or temprorarily). Provide description of required information on inspection forms. Describe recordkeeping requirements for Inspection reports and other SWPPP documentation. Provide signed owner/operator certifications. Specify that stucco, paint and drywall equipment will not be washed out into any drainageway or paved street. Explain ESC practices that will be used for sewer construction within Robb Wash. Describe permanent stabilization for the area disturbed within Robb Wash. Confirm 404 compliance. Describe and show ESC practices for work along Old Spanish Trail. Specify Sediment control measures other than silt fence for concentrated flow such as the outlet weir from the detention basin. |
| 10/07/2002 | PATRICIA GILBERT | NPPO | REVIEW | Denied | A pre-permit inspection is required to check preservation fencing prior to grading plan approval. To schedule an inspection please call 791-5608 ext. 1140. |
| 10/10/2002 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 10/10/ Please provide copies of the stamped approved tentative plat upon resubmittal of these plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/14/2002 | LISA LESNY | OUT TO CUSTOMER | Completed |