Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU02202
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2002 | JIM TATE | ENGINEERING | REVIEW | Denied | The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and flood plain comments have been addressed. 1. A Flood Use Permit is required prior to Grading Plan approval.. 2. The elevation datum for the WSEL is stated as NAVD 88. The Drainage Report specifies this as NGVD 29. Please correct. 3. Please note on the Grading Plan that all elevations shown are in NG-VD 29. 4. The south building is in the erosion hazard setback. Either relocate the building or show proposed bank protection with appropriate cross sections as designed in the Drainage Report. |
| 10/04/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Denied | The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and flood plain comments have been addressed. 1. A Flood Use Permit is required prior to Grading Plan approval.. 2. The elevation datum for the WSEL is stated as NAVD 88. The Drainage Report specifies this as NGVD 29. Please correct. 3. Please note on the Grading Plan that all elevations shown are in NG-VD 29. 4. The south building is in the erosion hazard setback. Either relocate the building or show proposed bank protection with appropriate cross sections as designed in the Drainage Report. |
| 10/11/2002 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | See Zoning Review Comments. Also see Enineering/Floodplain Comments. Grading plan will be approved after complettion of all other requirements |
| 10/25/2002 | LLESNY1 | NPDES | REVIEW | Passed | |
| 10/25/2002 | JOE LINVILLE | NPPO | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/25/2002 | LISA LESNY | OUT TO CUSTOMER | Completed |