Permit Number: T02BU02117
Parcel: Unknown

Address:
5265 S CIVANO BL

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU02117
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/27/2002 PAUL MACHADO ENGINEERING REVIEW Denied see flood folder.
08/27/2002 PATRICIA GILBERT NPPO REVIEW Approved
08/27/2002 ANY FLOODPLAIN REVIEW Denied To: Geoff Harris, P.E.
Project Manager
MMLA
SUBJECT: Civano Park and Play,
Grading plan T02BU02117 (First Review)
T15S, R15E, Section 01


RESUBMITTAL REQUIRED: Grading Plan


The Grading Plan (GP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.


Grading Plan:


1. Show Administrative address on plans.
2. Show a modified PC/COT Std. Dtl. 200 in the area of pedestrian crossing in the PAAL. See redlines.
3. Vertical curb per PC/COT standards must be used in the Right-of-way.
4. Install Access ramps at entrance to PAAL per PC/COT standards.
5. A sidewalk is called out adjacent to Common Area "A"/Open Space & Drainage area. Will a scupper be used in the sidewalk? The short sidewalk also makes an awkward situation.
6. Revise grading note 21 to read "All grading shall adhere to the latest addition of the 2000 IBC"
7. The DSMR will be required for the paving surface material in the PAAL. The minimum is a double shot chip seal.
8. In section H-3 the plan calls out for an extruded curb, yet the section shows a s/w at grade with a concrete header. Please revise.
9. A slope of 3:1 along the perimeter of the basketball court will require vegetation and may be too steep. Perhaps a 4:1 slope would suffice and no vegetation would be required. Please consider.


If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us
Paul Machado, Senior Engineering Associate,
08/28/2002 MSTPAUL1 NPDES REVIEW Passed
08/28/2002 MICHAEL ST. PAUL ZONING REVIEW Denied Engineering and Floodplain approval required.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/28/2002 MONICA VALDEZ OUT TO CUSTOMER Completed