Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU02015
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/16/2002 | MATT FLICK | ENGINEERING | REVIEW | Denied | ENGINEERING: The plans lack the detail typically found on construction plans. It is highly likely that there will be additional comments on the next submittal due to the lack of detail on these plans. An approved tentative plat/development plan is required. 1. All work shall conform to the IBC (2000), including all local amendments. 2. Any work within City of Tucson or Pima County right-of-way must be permitted by the appropriate authority. This review is for private property only. 3. Show location of access ramps into basins near Lots 1/2. 4. Provide additional grading information for the basins near Lots 1/2. 5. Provide additional grading information at property boundaries. Maintain two feet (2') horizontal distance between cut/fill slopes and property boundaries. Indicate elevations which show that grades do not impede offsite drainage onto this property. 6. Specify number, location and size of wall openings to allow for drainage onto the property. 7. Indicate roof drainage locations and provide scuppers beneath sidewalks to discharge the 10-year flow (D.S. 2-08.5.1.E) at roof drainage locations and other locations on site where drainage is discharged through the pedestrian facilities. 8. Provide storm drain plans. |
| 08/16/2002 | LOREN MAKUS | NPDES | REVIEW | Denied | Show existing and proposed drainage structures on Stormwater Pollution Prevention Plan. Show catch basin inlet protection on plan and provide details. The temporary sediment trap appears to be located at a proposed building location. Describe and show how the temporary sediment trap will become a building pad location. Explain how sediment control will be maintained after use of the temporary sediment has been discontinued. Provide details of all structural sediment controls. Show drainage patterns on SWPPP. Show how sediments will be controlled at the construction site entrances. Describe temporary stabilization practices for inactive areas. Describe inspection plan and specify the required information that must be included on all inspection reports. |
| 08/16/2002 | MATT FLICK | FLOODPLAIN | REVIEW | Denied | FLOODPLAIN: A floodplain use permit is necessary. Provide storm drain plans. |
| 08/19/2002 | JOE LINVILLE | NPPO | REVIEW | Denied | NPPO Pre permit Inspection required. |
| 08/19/2002 | CRAIG GROSS | ZONING | REVIEW | Denied | NEEDS APPROVED DP/TP |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/09/2002 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |