Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T02BU02014
Parcel: 10824013F

Address:
2550 E RIVER RD

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU02014
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/16/2002 MATT FLICK ENGINEERING REVIEW Denied ENGINEERING: The plans lack the detail typically found on construction plans. It is highly likely that there will be additional comments on the next submittal due to the lack of detail on these plans. 2 comments, related to water harvesting and flow acceptance, have also been placed on the landscape plans.

An approved development plan is required.

1. All work shall conform to the IBC (2000), including all local amendments.

2. Any work within City of Tucson or Pima County right-of-way or drainageway must be permitted by the appropriate authority. This review is for private property only.

3. Show location of access ramp into basin near Building #11.

4. Provide additional grading information for the basin near Building #11.

5. Provide additional grading information at property boundaries. Maintain two feet (2') horizontal distance between cut/fill slopes and property boundaries. Indicate elevations which show that grades do not impede offsite drainage onto this property. (There is also a comment on the landscape plan which calls for detailing of permiter walls/wall opening to allow for drainage onto the property.)

6. Provide construction information/grading information for the channel along the property line north of Buildings #15/#16.

7. Indicate roof drainage locations and provide scuppers beneath sidewalks to discharge the 10-year flow (D.S. 2-08.5.1.E) at roof drainage locations and other locations on site where drainage is discharged through the pedestrian facilities.

8. Provide storm drain plans.

9. Provide recording information for the temporary trail easement along the eastern property boundary.
08/16/2002 LOREN MAKUS NPDES REVIEW Denied Show existing and proposed drainage structures on Stormwater Pollution

Prevention Plan.

Show catch basin inlet protection on plan and provide details.

The temporary sediment trap is located at a proposed building location.

Describe and show how the temporary sediment trap will become a

building pad location. Explain how sediment control will be maintained

after use of the temporary sediment has been discontinued.

Provide details of all structural sediment controls.

Show drainage patterns on SWPPP. Show how sediments will be controlled

at the construction site entrances.

Describe temporary stabilization practices for inactive areas.

Describe inspection plan and specify the required information that must

be included on all inspection reports.
08/16/2002 PATRICIA GILBERT NPPO REVIEW Denied Development plan approval is required.

Once development plan is approved a pre-permit inspection is required prior to grading plan approval. The pre-permit is inspection is to verify the health of the salvaged vegetation. (Salvage permit 4/30/02)

To schedule inspection please call 791-5640, ext. 1140.
08/16/2002 MATT FLICK FLOODPLAIN REVIEW Denied FLOODPLAIN: A floodplain use permit is required.

1. Submit storm drain plans for review and approval.

2. If changes have occurred since approval of the development plan, a revised drainage report will be required.
08/16/2002 MICHAEL ST. PAUL ZONING REVIEW Denied See Floodplain, Engineering and NPPO comments.
08/16/2002 MICHAEL ST. PAUL ZONING REVIEW Denied NEED APPROVED DP/TP

Final Status

Task End Date Reviewer's Name Type of Review Description
09/09/2002 CINDY AGUILAR OUT TO CUSTOMER Completed