Permit Number: T02BU01449
Parcel: 106101650

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU01449
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/14/2002 DOUG WILLIAMS ENGINEERING REVIEW Denied Provide sheets titled "Grading Plan" in the next submittal package, fully labelled and dimensioned, clearly delineating limits of grading. The sheets should reflect the grading/construction activities indicated on the approved/phased site plan. Proposed grading in the public right of way (other than rough grading), must be in conformance with signed/approved Public Improvement Plans (by TDOT/Engineering). It is unclear when phase II will commence, thus a separate or revised grading permit may be necessary at such time.
07/12/2002 DOUG WILLIAMS FLOODPLAIN REVIEW Denied grading plans should match approved site plans (details elevations, phasing, etc). See Engineering folder
07/17/2002 LOREN MAKUS NPDES REVIEW Denied Please include:
Three signed copies of Notice of Intent (NOI); (One for the Stormwater Section, one for the site and one for the applicants file).

A signed project manager/owner certification .

A copy of grading and drainage plan for Stormwater Section files.

Statement that the project will be in compliance with local and state regulations.

Specify that inspection reports contain the required components.
Name & qualification of inspector
Date
Major observations
Sediment removal if sediment trap’s design capacity is reduced by 50%.
If everything is okay, certification that facility is in compliance with SWPPP.
07/24/2002 JOE LINVILLE NPPO REVIEW Approved
07/24/2002 MICHAEL ST. PAUL ZONING REVIEW Denied See Engineering and Floodplain comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/24/2002 ELAINE ROSE OUT TO CUSTOMER Completed