Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU01398
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/31/2002 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Michelle Guy, P.E. Centerline Offset, Inc. 242 N. 2nd Avenue SUBJECT: Domino's Pizza, Grading plan T02BU01398 (First Review) T15S, R15E, Section 22 RESUBMITTAL REQUIRED: GP The Grading Plan (GP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. The detention basin section A-A and the detention basin detail elevations do not match the approved development plan. Please address. 2. Provide basin responsibility note to general grading note. 3. Add project address to cover sheet. 4. A private improvement agreement may be necessary for work performed within the Right-of-way. Contact Department of transportation at (520) 791-4249. 5. Call out contour intervals in title block or below North arrow. 6. Provide note "Depress landscaped areas a maximum of 6" for water harvesting". 7. Please indicate cross slopes percentages on GP. A typical cross-section would suffice. This would satisfy the call outs on surface materials also. 8. List cut and fill quantities. 9. Indicate roof drainage patterns. 10. Show grade break at entrance if applicable. 11. Is the lot to the NW developed? If so, please show existing FFE. 12. Call out all slopes surrounding the detention basin. 13. Provide pedestrian barriers adjacent to detention basin. If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate |
| 05/31/2002 | PATRICIA GILBERT | NPPO | REVIEW | Denied | An approved Site plan is required prior to approval of the grading plan. Site may require a pre-permit inspection. Please add a general note: All grading is required to conform with the provisions of the Native Plant Preservation Ordinance. |
| 05/31/2002 | ANY | FLOODPLAIN | REVIEW | Denied | See eng. folder. |
| 06/03/2002 | MSTPAUL1 | NPDES | REVIEW | Passed | |
| 06/03/2002 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | See engineering/floodpalin comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/01/2002 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |