Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T02BU01031
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/06/2002 | ANY | ENGINEERING | REVIEW | Denied | sa To: Mike Baker, P.E. F.S.S.B. 340 S. Convent SUBJECT: Freestone Terrace, Grading plan T02BU01031 (First Review) T14S, R15E, Section 32 RESUBMITTAL REQUIRED: GP The Grading Plan (GP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. Complete note 11 in general grading notes. 2. Provide basin responsibility note to general grading note. 3. Add project address to cover sheet. 4. Complete Book and Page on cover sheet, also remove "improvement plans" on the title of the cover sheet and replace the word "paving" with "grading" in the title block of sheet 2. 5. A private improvement agreement may be necessary for work performed within the Right-of-way. Contact Department of transportation at (520) 791-4249. 6. Complete Docket and Page in the owner's block on sheet 1. 7. Call out contour intervals in title block or below North arrow. 8. Delineate 100-year floodplain limits on plan. 9. Show 50' erosion hazard setback line. 10. Provide note "Depress landscaped areas a maximum of 6" for water harvesting. If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate |
| 05/06/2002 | ANY | FLOODPLAIN | REVIEW | Denied | |
| 05/13/2002 | JOE LINVILLE | NPPO | REVIEW | Denied | Plan is not consistent with the proposed WASH Ordinance Mitigation Plan. |
| 05/16/2002 | LOREN MAKUS | NPDES | REVIEW | Denied | Stormwater Plan Certification must be signed. Include an additional copy of the SWPPP and grading plan for Stormwater section to keep for our files. |
| 05/16/2002 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Engineering, floodplain, NPDES required before zoning review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/24/2002 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |