Permit Number: T02BU00582
Parcel: 13303315D

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU00582
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2002 PAUL MACHADO ENGINEERING REVIEW Denied SUBJECT: Tag Elementary School,
Grading plan T02BU00582 (First Review)
T14S, R15E, Section 2


RESUBMITTAL REQUIRED: Grading Plan and Drainage Report

The Grading Plan and Drainage Report cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading plan:

1. The grading differential for this project exceeds the 2.0-foot allowed in Section 13 of the 2000 IBC. Please revise per code.
2. Letter or number the outlet detail on sheet. 2 and call out that detail, where applicable, on sheet. 1.
3. List the amounts of cut and fill. Not the difference between the two.
4. Please call out all grade breaks in the P.A.A.L.

Drainage report:

1. The U.S. Geological quadrangle maps (Figure 4) are generally not accepted per S.M.D.D.F.M. Chapter 2.3.1.3.A. Please explain.
2. Show the project boundary on figure 4 per S.M.D.D.F.M. Chapter 2.3.1.3.A.3.
3. Page 8 states that there is a copy of the project attached to the report, please attach a copy.

If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us
Paul Machado
Senior Engineering Associate
03/21/2002 PAUL MACHADO FLOODPLAIN REVIEW Denied
03/22/2002 LOREN MAKUS NPDES REVIEW Denied No Stormwater (NPDES) review is required. Disturbed area is less than 5 acres.
03/22/2002 JOE LINVILLE NPPO REVIEW Denied Approved copy of the native plant preservation required prior to plan approval. NPPO pre-permit inspection required prior to
plan approval. Call 791-5550 Ext. 118 to schedule
03/25/2002 PATRICIA GEHLEN ZONING REVIEW Denied Zoning 3/25/2002
Zoning will not review grading plans until Engineering/Floodplain has approved.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/15/2002 MONICA VALDEZ OUT TO CUSTOMER Completed