Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T02BU00446
Parcel: 141170140

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU00446
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2002 ANY ENGINEERING REVIEW Denied To: John Evans, P.E. Intertect DATE: March 12, 2002 6089 E. Grant Rd. Paul Machado Engineering Section


SUBJECT: Pyramid Credit Union,
Grading plan T02BU00446 (First Review)
T15S, R15E, Section 25


RESUBMITTAL REQUIRED: GP

The Grading Plan (GP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.


Grading Plan:


1. An approved Development plan must be submitted for final approval of grading plans.
2. Please delineate the 100-year flood plain limits in the PA.A.L.
3. A rip-rap splash pad maybe necessary at the toe of the slope for the Northeast drainage outlet (below the spillway).
4. Provide documentation the off-site flow is temporary, i.e. Drainage report, Master Plan, Statements etc…
5. A private improvement agreement may be necessary for work performed within the Right-of-way. Contact Department of transportation at (520) 791-4249.
6. Please list Benchmark and Basis of Elevation.
7. Call out depressed curb openings along the extruded curb, width and interval distances.
8. It is recommended but not required, that a 10'x10'x6" thick concrete apron be placed in front of the refuse container due to the weight of the service vehicle.

If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us

Paul Machado
Senior Engineering Associate
03/13/2002 PATRICIA GILBERT NPPO REVIEW Denied An approved developement plan is required. Once the development plan is approved, please call to schedule a pre-permit native plant preservation inspection. To schedule call, 791-5550 ext. 140.
03/13/2002 ANY FLOODPLAIN REVIEW Denied
03/14/2002 MSTPAUL1 NPDES REVIEW Passed
03/14/2002 MICHAEL ST. PAUL ZONING REVIEW Denied

Final Status

Task End Date Reviewer's Name Type of Review Description
03/15/2002 TAMI ACHONG OUT TO CUSTOMER Completed