Permit Number: T02BU00235
Parcel: 11942002C

Review Status: Completed

Review Details: GRADING

Permit Number - T02BU00235
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2002 JIM TATE ENGINEERING REVIEW Denied The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and flood plain comments have been addressed.

1. A Flood Use Permit is required prior to Grading Plan approval.

2. A copy of the stamped approved Site Plan must be included with the Grading Plan submittal prior to Grading Plan approval. The Grading Plan must match the Site Plan. Changes made to the Site Plan must be reflected on the Grading Plan.

3. Please include dimensions of the basin on the plan. (Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 2.3.1.6.A.4)

4. The Grading Plan does not provide finished grades or finished spot elevations at the new location of the building and upper parking lot. Please provide finished grades and slopes. IBC Chapter 36 Section 9.7.2

5. The proposed plan shows no bank protection for 3:1 slopes and dumped riprap on 2:1 slopes. Provide a soils engineering report showing that this bank protection is sufficient. IBC Chapter 36 Sections 9.3, 9.4

6. The topography shown on the east property boundary is inaccurate. The adjacent property owner has graded this area (it is now higher than that shown). The drainage structure in the northeast corner has been completely filled and a culvert installed. Please accurately portray the existing grades and drainage structures on the Grading Plan.
06/12/2002 JAMES TATE FLOODPLAIN REVIEW Denied A Flood Use Permit is required prior to Grading Plan approval.
06/26/2002 DAN CASTRO NPPO REVIEW Denied
06/26/2002 DAN CASTRO ZONING REVIEW Denied

Final Status

Task End Date Reviewer's Name Type of Review Description
07/01/2002 MONICA VALDEZ OUT TO CUSTOMER Completed