Permit Number: T01CM05502
Parcel: 115151540

Address:
624 W RILLITO ST

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T01CM05502
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/07/2001 JIM EGAN FIRE REVIEW Denied
11/08/2001 MARK TITUS WATER REVIEW Approved
11/19/2001 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Denied Mechanical See comments attached to application.
11/19/2001 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Denied Plumbing See comments attached to application.
11/20/2001 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Denied 1) The fixture submittal is marked "D" although it appears to be the "C" fixture. Assuming it is the "C" fixture it does not match the fixture schedule. In addition it does not meet the C.O.T lighting ordinance which prohibits ANY uplight. A shoebox type fixture with a flat, flush lens pointed straight down without an adjustable tenon must be specified. The fixture submittal must match the fixture schedule exactly.
2) The service lateral is customer provide. Provide a design.
3) Provide TEP AFC at the transformer secondary to begin your required fault current analysis. Unless an UL listed series rated system is specified fuse let through charts cannot be utilized.
4) Provide the feeder and conduit size to panel A.
5) In the description of the 400-amp service a 200 amp MCB is specified; please clarify your intent.
6) Provide a 1998 IECC lighting budget analysis.
7) Circuits A5, A7, and A17 serve 3 rows of lighting all connected to 1 pair of 3 way switches. Clarify how this is possible.
8) Provide disconnects, overload, and short circuit protection per 99NEC parts C, D, and J for all motors.
9) Circuit A14 has an incorrect load.
10) Circuit A2 appears in the panel schedule however I couldn't locate it on the plan.
11) Clarify what will be stored within the warehouse. Provide a letter from the owner (on their letterhead) or provide a letter sealed and signed by the architect or engineer of record.
12) Include the plans I have already reviewed along with your next submission.
13) Provide electrical specifications.
11/30/2001 PHIL SEADER BUILDING-COMMERCIAL REVIEW Denied
12/03/2001 PATRICIA GEHLEN ZONING REVIEW Denied
12/06/2001 MSTPAUL FLOODPLAIN REVIEW Passed
12/06/2001 MSTPAUL WWM REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/10/2002 CINDY AGUILAR OUT TO CUSTOMER Completed