Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T01CM05396
Review Name: REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/21/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please update lighting energy calculations. The current ASHRAE 90.1 that the City enforces is 2001, effective July 1, 2004. 2. Provide maintenance receptacle on roof for heat pumps. 3. Per Sheet M3, HP-2, HP-3, and HP-4 operate at 3-phase power. Mezzanine Level Power Plan and Panel MD schedule call for single phase power. Coordinate with Mechanical and clarify. 4. Per Sheet M3, MOPD for HP-2 and HP-3 is 40. Electrical calls for fusing at 60A and 70A CB. Coordinate with Mechanical and clarify. 5. Per Sheet M3, MOPD for HP-4 is 35. Electrical calls for fusing at 25A. It might be appropriate to verify that this level of protection will allow the motor to start. 6. It appears that Ckt B-1 should have 1500 VA (includes continuous load) instead of 600 VA. 7. It appears that Ckt B-2 should have 1875 VA (includes continuous load) instead of 600 VA. 8. It appears that Ckt B-3 should have 1500 VA (includes continuous load) instead of 600 VA. 9. It appears that Ckt B-4 should have 1875 VA (includes continuous load) instead of 600 VA. 10. It appears that Ckt B-5 should have 1143 VA (includes continuous load) instead of 760 VA. 11. It appears that Ckt B-6 should have 1125 VA (includes continuous load) instead of 300 VA. 12. It appears that Ckt B-8 should have 975 VA (includes continuous load) instead of 700 VA. 13. It appears that Ckt B-10 should have 2250 VA (includes continuous load) instead of 570 VA. 14. It appears that Ckt A-39 should have 900 VA (includes continuous load) instead of 540 VA. 15. It appears that Ckt A-41 should have 900 VA (includes continuous load) instead of 540 VA. |
10/04/2004 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/07/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
10/07/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |