Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T01CM05269
Review Name: REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E1 1. The closet doors impede upon the work clearance in front of the panel required by 99NEC 110-26. 2. The conduit containing (6) 6 and (2) 10 conductors must be 1.25" minimum. 3. It is unclear how you intend to serve the CU units, FC units, and receptacles. Clearly show every conduit, junction box; wire size, wire quantity, and circuit number on the plan. A tag schedule may be utilized however every conduit must be shown on the plan. Please note the multiple circuit conduits cannot be routed through the disconnects. See 99NEC 373-8. 4. Provide JB sizes. 5. The originally approved plan contains annotations. These corrections must be included on the revised plan. E2 1. Generally TEP provides the fault current for single-phase services at the point of attachment to the service. Please clarify the numbers provided by Ron Grant are at the secondary terminals of the utility transformer. 2. The originally approved plan contains annotations. These corrections must be included on the revised plan. For example the fuse and disconnect sizes are incorrectly shown on the revised plan. |