Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T01CM04461
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/10/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 01/22/2002 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | Variance Case C10-94-63 was approved with conditions. Continued compliance with those conditions is required: "no net loss of plantings" along the north property line (revise the plan to include all of the plants shown on the last approved site plan). "Existing vegetation" (as shown on last approved landscape plan) is required to "be relocated elsewhere on the site." "that vines be planted along the north wall" (locate and identify the required plantings on the current plan) Include reference to the last approved site/landscape plan (#114327) The garbage pickup area shown on the current plan as existing is not in compliance with LUC Sec. Table 3.7.2-I. This area must be relocated from the street landscape border. A 10' wide street landscape border is required for the addition adjacent to Erie Street. LUC Sec.3.7.2.4 Label and depict any required screening elements including those required for refuse storage areas. LUC Sec. Table 3.7.2-I. |
| 01/22/2002 | DAVID RIVERA | ZONING | REVIEW | Denied | The zoning comments are minor and I would be willing to review the plan over the counter after the plan has been revised. |
| 01/23/2002 | JOE LINVILLE | NPPO | REVIEW | Denied | Submit native plant presrevation plan or application for exception. LUC Sec. 3.8 |
| 01/31/2002 | JIM TATE | ENGINEERING | REVIEW | Denied | Please dimension the driveways and PAALs. |
| 01/31/2002 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 01/31/2002 | JIM TATE | SANITATION | REVIEW | Approved | |
| 02/01/2002 | PHIL SEADER | HANDICAP-SITE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/05/2002 | TGRIFFU1 | OUT TO CUSTOMER | Completed |